Similar Projects
Wendell Place Apartments
New Construction
Conception
Wendell, NC

Abbey Spring
New Construction
Conception
Apex, NC 27502

Hampton Spring
New Construction
Design
Raleigh, NC

Hillsborough Pointe
New Construction, Infrastructure
Design
$8,000,000 est. value
Raleigh, NC 27607

RFP Construction Manager at Risk - Reedy Creek Laboratory Campus Expansion and Renovation Project
Addition, Demolition, New Construction, Renovation, Infrastructure
Bidding
$32,694,966 CJ est. value
Raleigh, NC 27607

Airport Boulevard Sidewalk Project
Infrastructure
Post-Bid
$500,000 est. value
Morrisville, NC 27560

Request to Prequalify Vendors For Residential Asbestos Abatement Services
Term Contract, Infrastructure
Post-Bid
$200,000 CJ est. value
Raleigh, NC 27603

Morrisville Carpenter Road Project
Results
Less than $6,004,429 est. value
Morrisville, NC 27560

Morrisville Town Center Core - Phase I
New Construction - 277,300 SF
Results
$13,000,000 to $44,400,000 est. value
Morrisville, NC

Hilton Garden Inn & Homewood Suites
New Construction - 260,890 SF
Construction
$36,197,374 est. value
Raleigh, NC 27601

Davis Drive Apartments
New Construction - 107,950 SF
Construction
$15,000,000 est. value
Morrisville, NC

The Exchange Raleigh - Future Phases
New Construction, Infrastructure - 125,000 SF
Pending Verification
$850,000,000 CJ est. value
Raleigh, NC 27609

The Exchange Raleigh - Future Phases
New Construction, Infrastructure - 125,000 SF
Pending Verification
$850,000,000 CJ est. value
Raleigh, NC 27609

Wilder's Grove Retail
New Construction - 11,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Raleigh, NC

Glenlake III - Site Only Package
New Construction - 211,862 SF
Post-Bid
$10,000,000 CJ est. value
Raleigh, NC

Last Updated 09/23/2022 11:07 AM
Project Title

Cabarrus Street Mixed-Use Development

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27601   (Wake County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Hotel/Motel, Parking Garage, Paving/Reconstruction, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $60,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: site work, paving and new construction of a 12-story above grade multi-residential development, a retail development, a hospitality development and a parking garage. As of September 23, 2022, the project is in planning stage and seeking to acquire the property as well as rezoning approval from the City of Raleigh Planning Commission. Information regarding the architect, general contractor and a method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before third quarter 2022.

Details

12 Stories Above Grade, New Construction, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents