Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Water Main Replacement
Design
Elmwood Park, IL

Engineering, Planning and Development
Post-Bid

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Argonne Utilities Upgrades (Au2) Phase 1 Design
New Construction - 50,000 SF
Post-Bid
$95,000,000 to $105,000,000 est. value
IL

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

Tinley Creek Streambank Stabilization
Post-Bid
Orland Park, IL

Architect-Engineer Indefinite Delivery Contract for Inland Navigation and Water Resources Planning Services Assigned to the Great Lakes and Ohio River Division
Results
Less than $15,000,000 est. value
Chicago, IL - Louisville, KY - Buffalo, NY - Pittsburgh, PA - Nashville, TN - Huntington, WV

IDIQ Contract for Architect-Engineer Services for Compliance with Air Emission Regulations, EPCRA Regulations, Greenhouse Gas & All Other Environmental Media Regulations
Post-Bid

C--Multiple Award Task Order Contract (MATOC) for Geotechnical Engineering Service
Results
$500 to $25,000,000 est. value

Fiber Optic Backbone Engineering Services
Post-Bid
Chicago, IL

Last Updated 08/12/2022 12:35 PM
Project Title

RFQ - Various Phase I Engineering for Drainage Studies and Hydraulic Reports, Various Routes, Various Counties

Physical Address View project details and contacts
City, State (County) Schaumburg, IL 60194   (Cook County)
Category(s) Professional Services, Sewer and Water
Sub-Category(s) Engineering, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $16,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Job No. P-91-050-22, Various Phase I Engineering for Drainage Studies and Hydraulic Reports, Various Routes, Various Counties, Region One/District One. This project requires 21% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 28, 2022, at 9:30 AM at the Region One/District One Office in Schaumburg. Phase I engineering services are required for preparing Drainage Studies and Hydraulic Reports for various locations in District One. Typically, the studies and reports will be completed in conjunction with Project Reports prepared by others. All documentation and the supporting computations are to be presented in the study/report format as appropriate. Preparation of Location Drainage Studies shall be in accordance with the district requirements. Work orders under the blanket agreement will be negotiated and authorized by the department on an asneeded basis. The cumulative cost of construction of these projects is anticipated to be in excess of $16,000,000.00. The estimated engineering fee for this project is $800,000. The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Special Studies (Location Drainage) Location Design Studies (Reconstruction/Major Rehabilitation) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 015 - RFQ - Various Phase I Engineering for Drainage Studies and Hydraulic Reports, Various Routes, Various Counties

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents