Similar Projects
Last Updated | 08/12/2022 12:35 PM |
Project Title | RFQ - Various Phase I Engineering for Drainage Studies and Hydraulic Reports, Various Routes, Various Counties |
Physical Address | View project details and contacts |
City, State (County) | Schaumburg, IL 60194 (Cook County) |
Category(s) | Professional Services, Sewer and Water |
Sub-Category(s) | Engineering, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $16,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Job No. P-91-050-22, Various Phase I Engineering for Drainage Studies and Hydraulic Reports, Various Routes, Various Counties, Region One/District One. This project requires 21% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 28, 2022, at 9:30 AM at the Region One/District One Office in Schaumburg. Phase I engineering services are required for preparing Drainage Studies and Hydraulic Reports for various locations in District One. Typically, the studies and reports will be completed in conjunction with Project Reports prepared by others. All documentation and the supporting computations are to be presented in the study/report format as appropriate. Preparation of Location Drainage Studies shall be in accordance with the district requirements. Work orders under the blanket agreement will be negotiated and authorized by the department on an asneeded basis. The cumulative cost of construction of these projects is anticipated to be in excess of $16,000,000.00. The estimated engineering fee for this project is $800,000. The completion date for this contract will be 60 months after authorization to proceed. The Prime firm must be prequalified in the following categories to be considered for this project: Special Studies (Location Drainage) Location Design Studies (Reconstruction/Major Rehabilitation) Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 015 - RFQ - Various Phase I Engineering for Drainage Studies and Hydraulic Reports, Various Routes, Various Counties |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |