Similar Projects
Latino Cultural Center - AR00000005 - City of Phoenix
New Construction, Renovation, Infrastructure
Conception
$902,484 CJ est. value
Phoenix, AZ 85004

Airport T-Hangar Buildings - 103970 - City of Buckeye
New Construction, Infrastructure - 10,080 SF
Conception
$5,550,000 CJ est. value
Buckeye, AZ 85326

Stream Data Center - Phoenix II-V/Phase 2-5
New Construction, Renovation, Infrastructure - 1,582,000 SF
Design
$150,000,000 CJ est. value
Goodyear, AZ 85338

Central and Thomas High Rise
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Phoenix, AZ 85012

Lehi Loop Shared Use Pathway - Phase 1
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Mesa, AZ 85208

Lehi Loop Shared Use Pathway - Phase 1
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Mesa, AZ 85208

Pinnacle Peak Road 45th Avenue to 35th Avenue Paving and Storm Drain Improvements
Results
$9,000,722 est. value
Glendale, AZ 85310

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Bungalows on Westgate - Glendale
New Construction, Infrastructure
Construction
Glendale, AZ 85305

Laveen Spectrum
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Phoenix, AZ 85041

RFQ Design - Northeast Public Safety Facility
New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Mesa, AZ 85207

AutoZone #3000 / Phoenix
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Phoenix, AZ 85254

RFQ Construction Manager at Risk - Site 20 New Reservoir Construction
Infrastructure
Post-Bid
$13,700,000 CJ est. value
Gilbert, AZ 85297

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Last Updated 11/22/2022 10:12 AM
Project Title

RFQ Engineering - Val Vista Drive Improvements (Us 60 to Pueblo Avenue)

Physical Address View project details and contacts
City, State (County) Mesa, AZ 85204   (Maricopa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $17,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 22, 2022, this project is in the design phase. Information regarding the design firm has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to summer of 2023. *The closed solicitation has been included below for reference: The City of Mesa is seeking a qualified consulting firm, or team, to provide complete design services for the Val Vista Drive Improvements (US 60 to Pueblo Avenue). The design services will include preparing a Design Concept Report up to Final Construction Documents. The services may also include providing assistance to the City during construction. Roadway improvements will include the following: Safety upgrades, such as bicycle lanes, sidewalks improvements, and ADA compliance. Drainage improvements such as new storm drain, catch basins Reconstruction of the existing pavement section New pavement due to widening New curb and gutter Removal and replacement of existing driveways along Val Vista Drive New signage and striping Landscaping improvements Utility Relocations (Both City and Non-City Utilities) Traffic Signal Modifications at three (3) intersections that include Val Vista Drive / Hampton Avenue, Val Vista Drive / Southern Avenue, Val Vista Drive / Pueblo Avenue. Roadway lighting (New and Relocated streetlights) City owned Gas Line System Improvements that may include the replacement of high pressure valves, anode installation at regular intervals, replacement of steel pipe segments (with PE) on the IP system within the scope of the project, possible replacement of black-caps on tees Other miscellaneous improvements All interested firms are encouraged to attend the Pre-Submittal Conference since City staff will not be available for meetings or to respond to individual inquiries regarding the project outside of this Pre-Submittal conference. In addition, meeting minutes or any other information will not be posted from the Pre-Submittal Conference. Any parties interested in attending the Pre-Submittal Conference should request at invitation from Stephanie Gishey (stephanie.gishey@mesaaz.gov). Questions. Questions pertaining to the Design Services selection process or contract issues should be directed to Stephanie Gishey of the Engineering Department at Stephanie.Gishey@mesaaz.gov. The method of Contractor Selection has not been Determined at this time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents