Similar Projects
2022 Taxiway Microsurface Project
Infrastructure
Design
$500,000 CJ est. value
Valparaiso, IN 46383

SR 2 - Bridge Deck Overlay
Infrastructure
Design
$654,280 est. value
Hebron, IN

Porter County Roadway Project
Infrastructure
Bidding
$2,396,423 CJ est. value
Valparaiso, IN 46383

Asphalt Resurface
Infrastructure
Bidding
$520,000 CJ est. value
Portage, IN 46368

Replace Superstructure
Demolition, New Construction, Infrastructure
Post-Bid
$34,957,000 CJ est. value
Portage, IN 46368

Town of Chesterton - New Pickleball Courts
New Construction, Infrastructure
Post-Bid
$250,000 CJ est. value
Chesterton, IN 46304

Union Center Elementary School Additions & Renovations - 2022
Addition, Demolition, Renovation, Infrastructure
Results
$5,156,852 CJ est. value
Valparaiso, IN 46385

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Burke's Outdoor World
New Construction, Infrastructure - 21,125 SF
Construction
$5,600,000 CJ est. value
Valparaiso, IN 46385

Kossis Building
New Construction, Infrastructure
Pending Verification
$3,500,000 CJ est. value
Valparaiso, IN 46383

Intersect. Improv. W/ Added Turn Lanes
Infrastructure
Design
$7,296,393 CJ est. value
Valparaiso, IN 46383

Blackhawk Beach Stormwater Improvement Project
Infrastructure
Bidding
$300,000 CJ est. value
Valparaiso, IN 46383

Porter Lakes Elementary School Site Improvements
Results
Hebron, IN 46341

Marquette Greenway Trail - Phase 2
Infrastructure
Results
$280,005 CJ est. value
Burns Harbor, IN 46304

Liberty and Westchester Intermediate Schools - Athletic Site Projects
Infrastructure
Results
$5,829,500 CJ est. value
Chesterton, IN 46304

Last Updated 09/13/2022 01:42 PM
Project Title

Urschel Laboratories Expansion

Physical Address View project details and contacts
City, State (County) Chesterton, IN 46304   (Porter County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $33,000,000 [brand] Estimate
Plans Available from Design-Build Firm
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes construction of a 115,000-sq-ft building and purchase and installation of fabrication, welding, machining, assembly and testing equipment. As of September 5, 2022, Construction is expected to begin in Q4, 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

115,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents