Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Warm Beach Water System Water Replacement
Infrastructure
Bidding
$2,000,000 est. value
Stanwood, WA 98292

Redundant Feed to Squak Mountain Project
Infrastructure
Bidding
$1,400,000 est. value
Issaquah, WA

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA 99218

Libby Street Waterline Replacement
Term Contract
Bidding
$625,000 est. value
Clarkston, WA 99403

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

NE 45th St - NE 106th Ave to NE 109th Ave Water Main Replacement
Infrastructure
Bidding
Vancouver, WA 98668

SR 224 Van Giesen Improvement Phase One
Infrastructure
Post-Bid
West Richland, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

Water Main Replacement - Maple Drive AC Main
Infrastructure
Bidding
$280,000 to $320,000 est. value
Pasco, WA 99301

Last Updated 02/09/2022 12:55 PM
Project Title

Transmission Mains 1 and 2 Air Valve Replacement

Physical Address View project details and contacts
City, State (County) Lynnwood, WA   (Snohomish County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,150,000 to $1,250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1) Install new air valve vaults and assemblies and connect to existing transmission main. 2) Remove and dispose of existing air valve vaults and assemblies. 3) Modify existing air valve vaults and assemblies. 4) All associated activities related to the above work including but not limited to surveying, permitting, erosion and sedimentation control, excavating and shoring, traffic control, dewatering, paving, and restoration and other associated work items.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents