Last Updated 04/23/2021 11:54 PM
Project Title

Chocolate Bayou Detention Phase Three (Basin U) and Earthwork to Serve Meridiana

Physical Address View project details and contacts
City, State (County) TX   (Brazoria County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $749,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project scope shall include approximately 32 acres of mixed clearing, 83,000 CY of pond excavation, 550 LF of 24” to 48” RCP and 85 LF of 9'(W) x4'(H) RCB storm sewer.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents