Similar Projects
Y--Florida Ditch and Canal Lining
Design
$1,000,000 to $5,000,000 est. value
Durango, CO

Tenmile Intake Structure, Pipeline and Erosion Mitigation Improvements
Infrastructure
Bidding
Frisco, CO

Miscellaneous Flood and Greenways Construction Projects
Infrastructure
Bidding
Boulder, CO

Ponderosa Community Stabilization Project
Post-Bid
Boulder, CO

2020 Ditch Cleaning Project
Post-Bid
Gunnison, CO 81230

Pmaa, Wray SFU - Pond Liners
Results
Less than $361,669 est. value
Wray, CO 80758

Marion Street System, Phase 1
Results
$6,500,000 to $7,200,000 est. value
Denver, CO

Highline Lake State Park - Wastewater Plant Expansion
Infrastructure
Bidding
$1,400,000 est. value
Loma, CO 81524

Interior and Exterior Pond Maintenance
Post-Bid
Lone Tree, CO 80124

Centennial Center Park Drainage Construction
Results
Centennial, CO 80112

Reinforced Concrete Pipe
Term Contract, Infrastructure
Bidding
Fort Collins, CO

Storm Water Cover Replacement Project
Post-Bid
Snowmass, CO 81615

St Vrain State Park River Bank Stabilization
Results
Longmont, CO

FY 2021 Grading and Drainage Package
Infrastructure
Bidding
CO

Rockinghorse Filing 1 Drop Structure Replacement Project
Post-Bid
CO

Last Updated 07/13/2021 06:11 PM
Project Title

PUB Landside Drainage Improvements Project

Physical Address View project details and contacts
City, State (County) Pueblo, CO 81001   (Pueblo County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project will consist of installation of a new water quality pond with concrete outlet structure, new concrete storm drain inlets with grates and new storm drain piping as detailed in the plans and specifications for this project. The new water quality pond will be located just south of the Pueblo Memorial Airport parking lot with new inlets and storm sewer piping through the Pueblo Weisbrod Aircraft Museum connecting to an existing inlet in Keeler Parkway.

Details

Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Ponds and Reservoirs, Water Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents