Similar Projects
Continental Mill Riverwalk Path
Infrastructure
Conception
$391,000 est. value
Lewiston, ME

ADA Curb Ramp Improvements - Dover - Foxcroft, Hampden, Mount Desert Island and Southwest Harbor - Region 4
Infrastructure
Bidding
$291,000 est. value
Dover-Foxcroft, Hampden, Southwest Harbor, ME

ADA Curb Ramp Improvements - Dover - Foxcroft, Hampden, Mount Desert Island and Southwest Harbor - Region 4
Infrastructure
Bidding
$291,000 est. value
Dover-Foxcroft, Hampden, Southwest Harbor, ME

Sidewalk Construction Route 27 in the Municipalities of Boothbay and Boothbay Harbor
Post-Bid
$565,000 est. value
Boothbay, Boothbay Harbor, ME 04537

Windham Middle School SRRF Exterior ADA Access Upgrade
Post-Bid
Windham, ME 04062

Waterfront Parking Lot Improvements
Results
Less than $1,159,000 est. value
Damariscotta, ME 04543

South and Crescent Street Sidewalk Reconstruction Project
Results
Biddeford, ME

Main Street Sidewalk, Drainage, Water, and Sewer Improvements
Infrastructure
Bidding
$2,000,000 est. value
Southwest Harbor, ME 04662

Quarry Road Trails Single Track Enhancements
Infrastructure
Post-Bid
Waterville, ME 04901

Shaker Road Sidewalk and Drainage Improvements Project
Results
Gray, ME 04039

Crawford Drive Sidewalk and Road Improvements
Infrastructure
Bidding
$180,000 est. value
Bath, ME 04530

Clifford Park Black Trail Repair
Infrastructure
Post-Bid
Biddeford, ME 04005

Recreations Park Parking Area
Results
Wells, ME 04090

Broadway Pedestrian Safety Improvements Project - Bangor - Region 4 (LAP)
Infrastructure
Bidding
$155,000 est. value
Bangor, ME 04401

Landscape Paver Services for the Penobscot Job Corps Center
Infrastructure
Post-Bid
Bangor, ME 04401

Last Updated 06/27/2022 12:03 AM
Project Title

Riverwalk Phase 3

Physical Address View project details and contacts
City, State (County) Brewer, ME 04412   (Penobscot County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $710,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a mixed-use development in Brewer, Maine. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and road / highway. The lowest responsive bidder must have completed, or successfully complete, a highway prequalification or a project-specific prequalification to be considered for the award of this contract. Description: Maine Federal Aid Project No.:_2477300 WIN: 24773.00 Location: In Penobscot County, project is located off South Main Street along the Penobscot River. Outline of Work: Multi-use path, starting at Hardy Street and continuing along the river for 900 feet. For general information regarding Bidding and Contracting procedures, contact George Macdougall at (207) 624-3410. For Project-specific information, fax all questions to Project Manager at (207) 624-3431 using the electronic RFI form, or email questions to RFI-Contracts. MDOT@maine.gov, with the project name and identification number in the subject line. Questions received after 12:00 noon of the Monday (or if that Monday is a state holiday, Friday) before the bid date will not be answered. Bidders shall not contact any other MaineDOT staff for clarification of Contract provisions, and the MaineDOT will not be responsible for any interpretations so obtained. TTY users call Maine Relay 711. Each Bid must be made upon blank forms provided by MaineDOT and must be accompanied by a bid bond of 5% of the bid amount or an official bank check, cashier's check, certified check, certificate of deposit, or United States postal money order for 5% of the bid amount, payable to "Treasurer, State of Maine" as a Bid guarantee. A Contract Performance Surety Bond and a Contract Payment Surety Bond, each for 100% of the Contract price, will be required of the successful Bidder. This Contract is subject to all applicable Federal laws. This contract is subject to compliance with the Disadvantaged Business Enterprise program requirements as set forth by the Maine Department of Transportation. The right is hereby reserved to the MaineDOT to reject any or all bids. MEDOT - Riverwalk Phase 3 MaineDOT accepts electronic bids for bid packages posted on thewebsite. Electronic bids do not have to be accompanied by paper bids. MaineDOT will accept a facsimile of the bid bond, but the original bid bond must be received at the MaineDOT Contracts Section within 72 hours of the bid opening. Until further notice, dual bids (one paper, one electronic) will be accepted, with the paper copy taking precedence.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents