Similar Projects
Tennis Center
New Construction
Conception
Flower Mound, TX

North Kealy Avenue Mixed-Use Development
New Construction - 17,600 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Lewisville, TX

North Kealy Avenue Mixed-Use Development
New Construction - 17,600 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Lewisville, TX

Power Home Remodeling Offices
Build-Out - 4,100 SF
Bidding
Fort Worth, TX 76107

Anew Business Solutions Office & Warehouse
New Construction - 70,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Justin, TX 76247

New Denton Middle School 9 Project
New Construction
Post-Bid
Denton, TX 76201

Renovation/Remodel of the Existing Offices, Hallways and Restrooms at the C.H. Yoe High School AG Building
Renovation
Results
Cross Roads, TX 76520

Disaster Recovery Services
Results

The Brass Tap
Build-Out
Construction
Frisco, TX 75034

Starbucks
Build-Out - 2,224 SF
Construction
Westlake, TX 76262

Upland Properties Office Building
New Construction - 5,998 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Justin, TX 76247

Taco Bell
New Construction - 2,110 SF
Post-Bid
$400,000 est. value
Denton, TX 76207

CM at Risk Northwest High School Renovations
Renovation
Results
Justin, TX 76247

Lakeside Center
New Construction - 138,000 SF
Construction
$10,000,000 CJ est. value
Flower Mound, TX 75077

Communications Test Design Offices
Build-Out - 12,000 SF
Design
$300,000 est. value
Flower Mound, TX 75028

Reported 10/27/2021 12:00 AM
Project Title

Pike Middle School Replacement

Physical Address View project details and contacts
City, State (County) Justin, TX 76247   (Denton County)
Category(s) Commercial, Education, Entertainment/Recreation
Sub-Category(s) Athletic Facility, Food/Beverage Service, Middle/Senior High School, Office
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $94,620,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

250,000 SF - Middle/Senior High School, New Construction.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Furniture, Office Furniture, Multiple Seating, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents