Similar Projects
RFP Engineering - Bach Buxton Road Roundabout and Deerfield Road / Woodville Pike Roundabout Project
Infrastructure
Conception
$3,500,000 CJ est. value
Batavia, OH 45103

Owner Representation Services
Term Contract
Conception
$250,000 est. value
Painesville, OH

North Street Sanitary Interceptor Rehabilitation
Infrastructure
Design
$3,224,400 CJ est. value
Fremont, OH 43420

2022 Pavement Marking
Infrastructure
Design
$219,640 CJ est. value
Fremont, OH 43420

Newburgh Heights Multi-Street Improvements PH I
Infrastructure
Bidding
$977,449 CJ est. value
Newburgh Heights, OH 44105

Market Ave. S. Streetscape, Phase 3
Infrastructure
Bidding
$1,348,864 CJ est. value
Canton, OH 44707

Traffic Marking Paint - Rebid
Term Contract
Sub-Bidding
Toledo, OH 43604

Traffic Marking Paint - Rebid
Term Contract
Sub-Bidding
Toledo, OH 43604

IMOR, Institutional Maintenance Operations and Repair
Post-Bid
Cleveland, Sandusky, OH 44135

IMOR, Institutional Maintenance Operations and Repair
Post-Bid
Cleveland, Sandusky, OH 44135

Bridge Cleaning and Sealing 2021
Infrastructure
Results
$266,531 est. value
Columbus, OH

Refuse and Recycling Center, Animal Shelter and Stockpile Yard Improvements Project
Addition, Demolition, New Construction, Infrastructure, Renovation
Results
$9,365,000 CJ est. value
Cleveland, OH 44111

Woodhill Choice Roads Improvement - City of Cleveland
Infrastructure
Pending Verification
$6,800,000 CJ est. value
Cleveland, OH 44115

Circle Square Euclid Avenue and Reserve Court Reconstruction - City of Cleveland
Infrastructure
Pending Verification
$1,500,000 CJ est. value
Cleveland, OH 44115

Asphalt Street Resurfacing - Tipp City
Infrastructure
Conception
$590,000 CJ est. value
Tipp City, OH 45371

Last Updated 08/03/2022 03:31 AM
Project Title

Limestone and Asphalt Placement

Physical Address View project details and contacts
City, State (County) Sheffield Lake, OH 44054   (Lorain County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Maintenance, Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Sheffield Lake is accepting bids for and to enter into a contract with the lowest and best bidder for the purchase of premium no lead gasoline, regular no lead gasoline and premium low sulfur diesel; #304 limestone, #57 limestone and #8 limestone; asphalt placement for part or all of the 2022 road sections target list and concrete sidewalk installation for the 2022 sidewalk target list- Council Number 039. Please contact Patrick Hastings, Service Director at servicedirector @sheffieldlake.net or 440-949-6259 with questions. All aggregate bid prices shall include the cost of the delivery per ton. Fuel bids shall include providing tank(s) and pumping equipment which maintenance is at bidders' expense. Section 3 The 2022 asphalt placement target list shall consist of one or more of the following, in no particular order, based upon priority as determined by the City. o Unless noted, roads 2" mill, scratch and pave 2" (ODOT 448 or as approved by the city) o Tack Coat (ODOT 407) as determined o Asphalt placement/mill is to be submitted in square yard totals o Prevailing wage rates shall apply to placement 1.Gayle Drive (Erieview to Hawthorne) Estimated SY 3733 2.Hawthorne (Lynn Dr west to end) Estimated SY 388 3.Robinwood (Ferndale south to end) Estimated SY 1490 4.Hawthorne (Howell west to Stark) Estimated SY 1380 5.Stark (Hawthorne south to Ferndale) Estimated SY 1361 6.Stark (Forestlawn to South Dr) Estimated SY 2440 7.Pleasantview (Walker north to end) Estimated SY 3333 a.Pleasantview shall be quoted to include a leveling course and 2" overlay-no milling Section 4 The 2022 sidewalk placement target list shall consist of residential sidewalk placement/repair throughout the city. A specific target list by address is available on request by emailservicedirector@ sheffieldlake.net o Sidewalks shall be four feet wide and 4" thick except when crossing a driveway where 6" is required o Expansion joints shall be placed at regular intervals not more than 30' o Concrete shall be smoothed with a float, and given a broom finish o Concrete shall be 3000 psi or a 5 1/2 SAC mix o A minimum of 4" compacted aggregate base necessary for 6" concrete o Contraction joint spacing for sidewalk shall be 5', sawed or tooled o Excavation shall include soil backfill when forms are removed o Prevailing wage rates does not apply and contract will not exceed $50,000 o Concrete installation may be scheduled from through November 15, 2022 Quotes will be received in unit price per square foot at 4" thickness and unit price per square foot in 6" thickness. Specific bid documents are not required. Please include company name, contact information and bid/unit pricing. The City of Sheffield Lake maintains the right to accept or reject any and all bids.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents