Similar Projects
HVAC Upgrades at City Hall - City of Casper
Alteration
Conception
Casper, WY 82601

Administration Building HVAC Upgrades
Renovation
Sub-Bidding
$290,000 CJ est. value
Jackson, WY 83001

As-Needs HVAC Maintenance Service
Term Contract
Sub-Bidding
Cheyenne, WY 82001

Prexy's Pasture T Hot Water Heating Extension and Building Conversions
Renovation, Alteration
Post-Bid
Laramie, WY

Heating Upgrades
Alteration
Post-Bid
Jackson, WY 83001

Hulett School RTU Replacements
Alteration
Results
$300,000 est. value
Hulett, WY 82720

Story Elementary HVAC Upgrade
Alteration
Results
$100,000 est. value
Story, WY 82832

Jail HVAC Upgrades
Renovation
Sub-Bidding
$200,000 CJ est. value
Jackson, WY 83001

Coroners Office HVAC Upgrades
Alteration
Post-Bid
Jackson, WY 83001

Dubois School Boiler Replacement Project
Renovation
Sub-Bidding
$200,000 CJ est. value
Dubois, WY 82513

H941--Airflow Test and Balance (Tab) and HVAC Controller Services
Term Contract
Post-Bid
Loveland, CO - Cheyenne, WY 82001

Cooling Upgrade Cottonwood Elementary School
Renovation
Sub-Bidding
$200,000 CJ est. value
Casper, WY 82604

Replace the Pneumatic HVAC controls
Alteration
Post-Bid
Cody, WY 82414

Cooling Upgrades
Term Contract
Post-Bid
Casper, WY 82601

UW Cheyenne Family Medicine Clinic - Temperature Controls Upgrades
Alteration
Post-Bid
Laramie, WY 82071

Last Updated 10/31/2022 06:32 AM
Project Title

HVAC Remodel at Lovell Middle School

Physical Address View project details and contacts
City, State (County) Lovell, WY 82431   (Big Horn County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $1,075,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

1. Project consists of removal and replacement of the HVAC system throughout the school. HVAC demolition includes removal of all unit ventilators, air handling units, exhaust fans and the heating water boilers, pumps, and associated heating water piping. New packaged roof mounted air handling units with natural gas heat, DX cooling and economizer cooling are to be installed for each room/area. Supply and return air ductwork for each RTU system is to be installed above existing lay-in ceilings. To provide additional zoning for the office areas, VAV air terminals with electric reheat coils shall be used. New exhaust fans are to replace similar existing exhaust fans. A new web based DDC temperature control system including sensors, graphics, and programming shall be included. Temporary removal of suspended lay-in ceiling tiles in the classrooms is required in order to install the new ductwork. Lay-in ceiling tiles are to be reinstalled after work above the ceiling is complete. 2. Structural reinforcement is required for the roof framing to accommodate the new roof mounted HVAC equipment. Other work included in project scope includes new casework in the classrooms where existing unit ventilators are removed, along with exterior wall infill at wall louvers. Removal of existing carpet and providing new carpet tiles in some areas of the school is also part of the project scope. Est. Completion Date: Aug. 11, 2023 Site Directions: Lovell Middle School 325 W 9th Street

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents