Similar Projects
Bird Creek Detention Pond - City of Temple
Infrastructure
Conception
$3,043,000 est. value
Temple, TX

Little Elm Trunk Sewer North East Extension - City of Temple
Infrastructure
Conception
$1,400,000 est. value
Seaton, TX 76501

BancorpSouth - Adams Avenue Branch / Temple
Addition, Demolition, Infrastructure, Renovation - 6,264 SF
Design
$1,750,000 CJ est. value
Temple, TX 76502

Yerico Manufacturing Warehouse
New Construction, Infrastructure - 30,000 SF
Design
$2,500,000 CJ est. value
Elgin, TX 78621

RFQ Design - Professional Architectural and Engineering Design and Management Services for the Emergency Operation Complex and Fire Station No. 4
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Killeen, TX 76541

Reconstruction of Three (3) Single Family Units
Demolition, New Construction, Infrastructure
Bidding
$130,000 CJ est. value
Muleshoe, TX 79347

Advanced Metering Infrastructure (Ami) for Water Meter System
Post-Bid
Bastrop, TX 78602

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Hanks Creek Water System Extension
Results
$395,000 est. value
Huntington, TX 75949

2019-2020 Cdbg Wastewater Line Improvements
Infrastructure
Results
Rockport, TX 78382

Starbucks / Killeen
Infrastructure, Renovation - 2,390 SF
Construction
$750,000 CJ est. value
Killeen, TX 76549

Starbucks / Killeen
Infrastructure, Renovation - 2,390 SF
Construction
$750,000 CJ est. value
Killeen, TX 76549

Knob Creek Basin Wastewater Projects
Infrastructure
Pending Verification
$28,930,000 est. value
Temple, TX

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

NW 36 Transmission Main (WTP to SH 317) - City of Temple
Infrastructure
Conception
$81,000,000 est. value
Temple, TX 76501

Last Updated 09/21/2022 01:33 AM
Project Title

Water Line Improvements

Physical Address View project details and contacts
City, State (County) Palo Pinto, TX 76484   (Palo Pinto County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $360,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing and installing approximately 13,490 linear feet of 3-inch SDR-21 PVC Water Lines and associated appurtenances. The project also consists of an Additive Alternate Bid to furnish and install approximately 10,100 linear feet of 3-inch SDR-21 PVC Water Line and all associated appurtenances. This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). Any contract or contracts awarded under this Invitation for Bid are expected to be funded in part by financial assistance from the Texas Water Development Board. Neither the State of Texas nor its departments, agencies, or employees are or will be a party to this Advertisement for Bids or any resulting contract. The Owner reserves the right to waive any informalities and to reject any or all bids. Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of federal law, including federal appropriation acts and Section 1452 (a)(4) of the Safe Drinking Water Act (42 U.S.C. 300j-12(a)(4), as applicable. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex (including pregnancy), sexual identity, gender identity, national origin, age (40 or older), disability or genetic information. This contract is subject to the Environmental Protection Agency's (EPA) Disadvantaged Business Enterprise (DBE) Program, which includes EPA-approved fair share goals toward procurement of Minority and Women-owned Business Enterprise (M/WBE) businesses. EPA rules require that applicants and prime contractors make a good faith effort to award a fair share of contracts, subcontracts, and procurements to M/WBEs through demonstration of the six affirmative steps. For more details on the DBE Program and the current, applicable fair share goals, please visit www.twdb.texas.gov/dbe.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents