Similar Projects
Roadway Crack Sealing
Infrastructure
Bidding
CO

High Country Training Center Improvements
Post-Bid
Frisco, CO 80443

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

CO CRVFO Roads & Construction IDR 2020
Results
$25,000 to $150,000 est. value

CO LSFO Roads & Construction IDR 2020
Results
$25,000 to $40,000 est. value

2020 Boreas Pass Road Reconstruction
Post-Bid
Frisco, CO 80443

CO KFO Roads & Construction IDR 2020
Results
$25,000 to $170,000 est. value

Hamilton Creek Road Resurfacing Project
Post-Bid
Dillon, CO 80435

Asphalt Overlay
Results
Breckenridge, CO 80424

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

2020 Chip Seal
Results
Less than $70,000 est. value
Silverthorne, CO 80498

High Country Training Center Improvements
Post-Bid
Frisco, CO 80443

2020 Mill and Fill
Results
Silverthorne, CO 80498

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Shekel Lane Road Reconstruction
Results
Frisco, CO 80443

Last Updated 08/27/2021 10:07 AM
Project Title

Burgundy Circle and Drive Road Reconstruction

Physical Address View project details and contacts
City, State (County) Frisco, CO   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,882
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: 1. One inch mill of roadway to include preparing the asphalt pavement resurfacing. 2. Provide, place and compact 2" of HMA on approximately 5,600 SY of asphalt. 3. Remove and Replace two 24 inch diameter corrugated metal culvert pipe with end sections 4. Perform all work in accordance with the plans and specifications provided 5. Perform organic material ditch cleaning with haul off.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents