Similar Projects
Global Learning Charter Public School Renovations
Renovation
Conception
New Bedford, MA 02746

Sparhawk Academy
New Construction - 8,000 SF
Design
Millis, MA

Tyngsborough Middle School
Addition
Design
$81,000,000 est. value
Tyngsborough, MA 01879

Sale and Development of the Former Rogers Elementary School
Bidding
Fairhaven, MA 02719

Boston Public Schools Architectural Study
New Construction, Renovation
Bidding
Boston, MA

124,200 SF Middle School to be Constructed on the Current Middle School - Filed Sub-Bids
New Construction, Alteration - 124,200 SF
Sub-Bidding
$68,900,000 est. value
Somerset, MA 02726

Tisbury School Renovation and Addition
Renovation, Addition
Sub-Bidding
$44,000,000 est. value
Tisbury, MA 02568

Josiah Quincy Upper School Swing Space Project - Filed Sub Bids
Post-Bid
$1,044,030 est. value
Boston, MA

Hampden Charter School of Science Gymnasium - General Bids
Renovation
Post-Bid
$2,400,000 est. value
West Springfield, MA

Lowell High School - Filed Sub Bids
Renovation, Addition
Results
$270,000,000 est. value
Lowell, MA

Sharon High School - Filed Sub Bids
New Construction - 240,204 SF
Results
$125,351,000 est. value
Sharon, MA 02067

Construction Manager at Risk Services For a New 233,000 Square Foot Middle School
New Construction - 233,000 SF
Construction
$95,000,000 est. value
Beverly, MA

Argosy Collegiate Charter School
Addition - 58,219 SF
Construction
Less than $3,000,000 est. value
Fall River, MA 02721

The Gilder Center
New Construction - 42,000 SF
Pending Verification
$30,000,000 est. value
Gill, MA 01354

Derby Academy Expansion
Addition
Pending Verification
Hingham, MA 02043

Last Updated 03/10/2022 12:18 PM
Project Title

Fy22 Barnstable High School Rooftop Unit Replacement - Filed Sub Bids

Physical Address View project details and contacts
City, State (County) Barnstable, MA 02601   (Barnstable County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work will include all operations necessary to deliver the building(s) and ancillary on and off-site amenities in a fully installed and operable condition including all utility and site work and obtaining all necessary licenses, permits, and certificates. 5. Remove and dispose of existing rooftop units #1, #2, #3 and #10, including a portion of associated ductwork, sleeves, dampers, and other components as indicated on the Drawings, by the HVAC Filed Sub-Bidder. 6. Carefully remove and salvage portions of existing suspended acoustical tile ceiling and grid to accommodate the work above the ceiling, and reinstall at completion of the work. 7. Remove and dispose of wood-framed roof curbs under rooftop units #1, #2, #3 and #10, and temporary roof protections by the Roofing and Flashing Sub-Bidder. 8. Remove and dispose of a portion of the gypsum wallboard partition above the soffit in the Cafeteria in order to access existing steel beam for reinforcement by the General Bidder. Carefully remove, store and protect existing duct risers (by HVAC Filed-Sub Bidder) and flat screen monitor and other wall-hung devices in the area of wallboard demolition. 9. Provide and install rooftop units #1, #2, #3 and #10, including all associated ductwork, sleeves, dampers, vibration and seismic restraints, controls, and other components as indicated on the Drawings, as well as testing and balancing of the units, by the HVAC Filed Sub-Bidder.. 10. Provide lightning protection for each unit, grounded, by Electrical Filed Sub- Bidder. 11. Provide all required circuitry, breakers, feeders and wiring for the rooftop units, receptacles, fire alarm, duct smoke detectors, including extending necessary circuitry, testing and programming and all related electrical work as indicated in the drawings and specifications, by Electrical Filed Sub-Bidder. 12. Carefully remove and relocate all lighting and other devices in the ceilings and on the soffit in the areas of demolition and to accommodate the above-ceiling structural work, and re-install in the same location at the completion of the work, by Electrical Filed Sub-Bidder. 13. Provide and install firestopping sealants at all penetrations in fire rated assemblies, by the General Bidder and each Filed Sub-Bidder for their respective work. 14. Provide and install structural steel reinforcing to existing steel, as indicated on the Structural Drawings. 15. Provide and install steel dunnage on the roof including posts down to existing deck, as indicated on the Structural Drawings.

Details

Middle/Senior High School, Renovation.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents