Similar Projects
Intersection - LOR-SR 113-03.75 Baumhart Sfty
Bidding
OH

Paving Various Columbia Township Roads
Bidding
Columbia Station, OH

S.R.83–South Avon Beldon Road Widening
Post-Bid
$228,650 est. value
Avon, OH

LOR Elyria TLCI Phase 4 ODOT LPA
Post-Bid
Elyria, OH

Concrete Roadway Repair/Replacement
Results
Grafton, OH 44044

Middle Ridge Road / West Ridge Road Intersection Improvement
Results
$444,398 est. value
Elyria, OH 44035

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Bidding

2021 Concrete Street Program
Post-Bid
Avon Lake, OH

Oberlin - Elyria Road Resurfacing
Results
$891,534 est. value
North Ridgeville, OH 44035

Resurfacing of Lowell Street
Post-Bid
Elyria, OH 44035

Street Patching within the City of Lorain
Results
Lorain, OH 44052

Grafton Chestnut Street Improvement Phase 2
Results
Less than $926,690 est. value
Grafton, OH 44044

Ranger Way Extension
Results
$1,465,100 est. value
North Ridgeville, OH 44039

2020 Asphalt Street Program
Results
Avon Lake, OH 44012

Annual Chip and Seal Program Throughout the Township
Results
Wellington, OH 44090

Last Updated 03/13/2020 06:41 AM
Project Title

Two Lane Resurfacing - Findley State Park Main Road

Physical Address View project details and contacts
City, State (County) OH   (Lorain County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improving Various Routes within Findley State Park in Huntington and Wellington Townships, of Lorain County, of Ohio, in Accordance with Plans and Specifications by Resurfacing Existing Routes and Related Work. Section 0001 Roadway Line Alt Item Code Item Description Wt Unit Quantity 0001 202e23000 Pavement Removed (Wt: Nr) Nr Sy 66.000 0002 202e35100 Pipe Removed, 24" And Under (Wt: Nr) Nr Ft 2.000 0003 203e10000 Excavation (Wt: 06) 06 Cy 123.000 0004 203e20000 Embankment (Wt: 06) 06 Cy 48.000 0005 209e60500 Linear Grading (Wt: 06) 06 Mile 6.560 Section 0002 Erosion Control Line Alt Item Code Item Description Wt Unit Quantity 0006 659e00100 Soil Analysis Test (Wt: Nr) Nr Each 2.000 0007 659e00300 Topsoil (Wt: 46) 46 Cy 10.000 0008 659e10000 Seeding And Mulching (Wt: 46) 46 Sy 86.000 0009 659e14000 Repair Seeding And Mulching (Wt: 46) 46 Sy 5.000 0010 659e15000 Inter-Seeding (Wt: 46) 46 Sy 5.000 0011 659e20000 Commercial Fertilizer (Wt: 46) 46 Ton 0.020 0012 659e31000 Lime (Wt: 46) 46 Acre 0.020 0013 659e35000 Water (Wt: 46) 46 Mgal 1.000 0014 832e30000 Erosion Control (Wt: 08) 08 Each 5,000.000 Section 0003 Drainage Line Alt Item Code Item Description Wt Unit Quantity 0015 611e01800 8" Conduit, Type b (Wt: 35) 35 Ft 5.000 Section 0004 Pavement Line Alt Item Code Item Description Wt Unit Quantity 0016 251e01042 Partial Depth Pavement Repair (Asphalt Concrete Base) (Wt: 16) 16 Cy 517.000 0017 252e01500 Full Depth Pavement Sawing (Wt: 15) 15 Ft 60.000 0018 253e02000 Pavement Repair (Wt: 16) 16 Cy 30.000 0019 254e01000 Pavement Planing, Asphalt Concrete (0.75") (Wt: 13) 13 Sy 39,320.000 0020 254e01600 Patching Planed Surface (Wt: 16) 16 Sy 211.000 0021 407e10000 Tack Coat (Wt: 10) 10 Gal 3,556.000 0022 408e10001 Prime Coat, As Per Plan (Wt: 10) 10 Gal 2,963.000 0023 442e00201 Asphalt Concrete Surface Course, 9.5 Mm, Type a (446), As Per Plan Cy 1,655.000 (Pg64-22) (1.50") (Wt: 10) 10 0024 617e10100 Compacted Aggregate (Wt: 06) 06 Cy 755.000 Section 0005 Traffic Control Line Alt Item Code Item Description Wt Unit Quantity 0025 642e00100 Edge Line, 4", Type 1 (White) (Wt: 45) 45 Mile 5.920 0026 642e00100 Edge Line, 4", Type 1 (Yellow) (Wt: 45) 45 Mile 0.460 0027 642e00300 Center Line, Type 1 (Wt: 45) 45 Mile 3.130 Section 0006 Traffic Control Alternates Line Alt Item Code Item Description Wt Unit Quantity 0028 Aa1 642e00500 Stop Line, Type 1(Alternate 1) (Wt: 45) 45 Ft 311.000 0029 Aa1 642e01322 Wrong Way Arrow, Type 1(Alternate 1) (Wt: 45) 45 Each 10.000 0030 Aa2 644e00500 Stop Line(Alternate 2) (Wt: 45) 45 Ft 311.000 0031 Aa2 644e01360 Wrong Way Arrow(Alternate 2) (Wt: 45) 45 Each 10.000 Section 0007 Maintenance Of Traffic Line Alt Item Code Item Description Wt Unit Quantity 0032 614e13000 Asphalt Concrete For Maintaining Traffic (Wt: 39) 39 Cy 10.000 0033 614e21100 Work Zone Center Line, Class i, 642 Paint (Wt: 39) 39 Mile 3.160 0034 614e26200 Work Zone Stop Line, Class i, 642 Paint (Wt: 39) 39 Ft 311.000 Section 0008 Structure Repair (Sfn: 4726235) Line Alt Item Code Item Description Wt Unit Quantity 0035 846e00111 Polymer Modified Asphalt Expansion Joint System, As Per Plan (Wt: Cf 34.000 27) 27 Section 0009 Incidentals Line Alt Item Code Item Description Wt Unit Quantity 0036 103e05000 Premium For Contract Performance Bond And For Payment Bond Ls 1.000 (Wt: Nr) Nr 0037 614e11000 Maintaining Traffic (Wt: 39) 39 Ls 1.000 0038 623e10000 Construction Layout Stakes And Surveying (Wt: Nr) Nr Ls 1.000 0039 624e10000 Mobilization (Wt: Nr) Nr Ls 1.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents