Similar Projects
Removal and Installation of Roof Top HVAC Unit Inventory Stock Room
Renovation
Sub-Bidding
$400,000 CJ est. value
Waterford, MI 48328

Removal and Installation of Roof Top HVAC Unit Inventory Office
Renovation
Sub-Bidding
$400,000 CJ est. value
Waterford, MI 48328

HVAC and Mechanical Products
Term Contract
Post-Bid

Novi Gardenbrook Building (Old Wash Collage) Bid Package #7
Post-Bid
Novi, MI 48375

HVAC Equipment Preventative Maintenance Program
Term Contract
Results
Berkley, MI 48072

HVAC On-Call Services
Term Contract
Results
Southfield, MI

Removal and Installation of Roof Top HVAC Unit Sign Shop
Renovation
Sub-Bidding
$400,000 CJ est. value
Waterford, MI 48328

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Preventative Maintenance and Service - Chillers
Term Contract
Results
Beverly Hills, MI

Removal and Installation of Roof Top HVAC Unit Sign Shop Office
Renovation
Sub-Bidding
$400,000 CJ est. value
Waterford, MI 48328

HVAC Mechanicals Preventative Maintenance - West Bloomfield Library
Alteration
Post-Bid
West Bloomfield, MI

Repair/Refurbish Vilter Ammonia Compressor 450XL
Results
Farmington Hills, MI

Removal and Installation of Roof Top HVAC Unit District 9 Shop
Renovation
Sub-Bidding
$400,000 CJ est. value
Waterford, MI 48328

Mcquay Chiller Replacement (Two 60-Ton Chillers)
Alteration
Post-Bid
Farmington, MI

HVAC Project - Heating and Cooling Replacements
Results
Auburn Hills, MI 48326

Last Updated 08/19/2022 01:05 AM
Project Title

Fire Station 4 HVAC Removal and Replacement

Physical Address View project details and contacts
City, State (County) Bloomfield Township, MI 48302   (Oakland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Township of Bloomfield is accepting bids for the removal of two (2) Lennox Split Air Handling Units at Fire Station #4. Although this is a commercial building, it was renovated from the former residential home that occupied the lot. The replacements shall be one (1) 5-ton Trane Air Handling Unit with electric heat, one (1) 5-tonTrane condenser, one (1) Trane 3-ton Air Handling Unit, one (1) 2.5-ton Trane Condenser, two (2) new condensate pumps, and drains run through the roof. New electric shall be required to service the electric heaters. Two additional diffusers shall be installed over the sleeping quarters. Start-up of the equipment shall be included. The proposal shall include all parts and labor to remove and replace the two existing units, including plumbing, electrical and incidentals required to complete the job. Safety measures shall be put in place to protect both life and property of the workforce, the public, and employees Delivery Point Local Purchase Type One Time Only- Delivery Date:01/31/2023 Question Acceptance Deadline 08/24/2022 12:00 AM EDT Questions are submitted online No

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents