Similar Projects
SR 802 (Lake Worth Rd)
Infrastructure
Bidding
$10,205,205 est. value
FL

Sanitary Sewer Collection System Rehabilitation
Post-Bid
FL

Unit 53 Arden Parcels D-Southeast, H-North and I-North Public Improvement Project
Infrastructure
Post-Bid
FL

Construction Manager-at-Risk for Belmonte Road and Pershing Way Water and Sewer Improvements
Results
Less than $200,000 est. value
West Palm Beach, FL

Lakeview Avenue Sanitary Sewer Replacement Phase 1
Results
$1,100,000 est. value
West Palm Beach, FL 33402

FY 21-22 Point of Service Cleanout Addition Program
Term Contract
Post-Bid
Palm Beach Gardens, FL

Sewer Pipeline, Manhole Cleaning and Inspection Services
Term Contract
Results

Construction of the NW 1st Avenue Streetscape
Infrastructure
Post-Bid
Boca Raton, FL

Olympus Drive Force Main and Low Pressure Sewer Replacement
Results
Juno Beach, FL 33408

Gravity Sewer Manhole Frame and Cover, Purchase and Delivery
Infrastructure
Post-Bid
FL

181st Street Neighborhood Gravity Sewer System
Results
Less than $250,000 est. value
Loxahatchee, FL

State Road A1A Gravity Sanitary Sewer Rehabilitation
Infrastructure
Post-Bid
Highland Beach, FL 33487

Drain Cleaning Services for Grease Traps, Building and Storm Drain Lines, Lift Stations and Wastewater Tanks
Results
FL

Heron Parkway Drainage Improvements
Infrastructure
Post-Bid
$100,000 est. value
Royal Palm Beach, FL 33411

Osceola Park Neighborhood Improvements (Phase II)
Results
Delray Beach, FL

Last Updated 05/24/2022 09:20 AM
Project Title

Roosevelt Estate 7th Street Utility Improvement

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33422   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,455,893
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing sanitary sewer is located near the roadway centerline and varies between 4-ft to 10-ft deep. The project calls for rehabilitation of the existing 8-inch VCP sanitary sewer pipe by Cured-in-Place Lining (CIPP) from 11th Street to Australian Avenue for approximately 3300 linear feet. The work also includes sanitary sewer manhole rehabilitation, sanitary sewer lateral rehabilitation, clean-out installation, and incidental sidewalk replacement.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents