Similar Projects
Manhole & Structure Coring And Sawing
Term Contract
Post-Bid
Minneapolis, MN 55401

Inspection and Cleaning of Sanitary and Storm Water Piping
Term Contract
Post-Bid
Moorhead, MN 56563

20" Forcemain Replacement
Results
Saint Joseph, MN

Sanitary Sewer Lining
Renovation
Results
Less than $1,190,539 est. value
Roseville, MN 55113

Citywide Sewer Lining
Post-Bid
Saint Paul, MN

Vincent Avenue North Sanitary and Storm Sewer
Renovation
Results
Minneapolis, MN 55401

2021 Stabilize And Pave Road Bed
Post-Bid
MN

Meter Station M228A, Interceptor 7015C, and L35 Repair
Renovation, Addition
Results
Brooklyn Park, Maple Grove, MN 55101

2021 Roads Maintenance
Renovation
Post-Bid
Red Wing, MN

Zachary Lane Elementary School - 2021 LTFM
Renovation
Results
Less than $1,200,000 est. value
Minneapolis, MN 55442

DNR3 Sand Dunes South Road Lifting
Post-Bid
Big Lake, MN 55309

Medina Country Club Sewer Rehabilitation
Results
$108,000 est. value
Medina, MN 55340

DNR2 Aitkin Area Road Grading
Term Contract
Post-Bid
Aitkin, MN

Water System Expansion Utility Improvements
Results
Carver, MN 55315

DNR3 Aspen Forest Road Upgrade
Renovation
Post-Bid
MN

Last Updated 05/27/2021 11:52 AM
Project Title

2nd Street Southeast Street and Utility Improvements

Physical Address View project details and contacts
City, State (County) Pipestone, MN 56164   (Pipestone County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

6” Concrete Pavement 8,800 SY Sanitary Service 1,040 LF Bituminous Patch 670 SY Sanitary Manhole 77 LF Aggregate Base 3,700 TON 12”-42” Storm Sewer 2,300 LF Curb & Gutter 4,700 LF Storm Manhole 69 LF Select Granular Borrow 3,900 TON Storm Catch Basin 70 LF Common Excavation 7,600 CY Concrete Walk 12,000 SF Turf Establishment 2.0 Acres Concrete Driveway 1,900 SY Watermain 2,600 LF Underdrains 4,500 LF Water Service 1,200 LF Bituminous Pavement Alternate 2,200 TON Sanitary Sewer 2,400 LF Jack & Auger Casing 370 LF

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents