Similar Projects
Site 114-E-W-4 New Relief Elementary
Conception
$29,100,000 est. value
Orlando, FL 32809

Site 45-M-SE-2 Elementary
New Construction
Conception
$46,700,000 est. value
Orlando, FL 32827

Site 90-K8-N-7 K8 School
New Construction - 164,000 SF
Design
Less than $49,000,000 est. value
Apopka, FL 32712

Central Florida Preparatory School
New Construction - 53,000 SF
Design
Apopka, FL 32703

Center for Jewish Life School
Renovation - 10,738 SF
Bidding by Invitation
Orlando, FL 32819

Site 114-E-W-4 New Elementary School Relief Project
New Construction - 94,369 SF
Sub-Bidding
Less than $27,200,000 est. value
Winter Garden, FL 34787

Site 89-E-W-4 Elementary
New Construction - 88,900 SF
Sub-Bidding
$27,200,000 est. value
Orlando, FL 32809

Pinar Elementary School Comprehensive/Replacement Project Stormwater Revisions
New Construction, Renovation - 85,201 SF
Post-Bid
Less than $12,700,000 est. value
Orlando, FL 32800

Construction Management at Risk for Acceleration East Capital Renewal Project
New Construction - 57,626 SF
Post-Bid
Less than $2,429,000 est. value
FL

Construction Manager at Risk Services for Site 132-M-W-4 Middle School and Site 89-E-W-4 Elementary School Projects
New Construction
Results
Less than $57,000,000 est. value
Orlando, FL 34787

Disaster Recovery Services
Results

New Magnolia School New Behavior Center OCPS
New Construction - 164,314 SF
Construction
Orlando, FL 32818

Site 43-E-SE-2 Elementary School Project
New Construction - 92,117 SF
Construction
Less than $20,000,000 est. value
Orlando, FL 32809

Site 65-M-W-4 Elementary
New Construction
Conception
$46,900,000 est. value
Orlando, FL 32809

Site 73-T-W-7 School Replacement
New Construction - 150,289 SF
Design
$38,800,000 est. value
Ocoee, FL 34761

Last Updated 06/23/2020 01:26 PM
Project Title

Construction Management at Risk Services for Site 30-E-SE-3 New Elementary School

Physical Address View project details and contacts
City, State (County) Orlando, FL   (Orange County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $21,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the reuse of a multi-story prototype elementary school on a new 10.72-acre site to provide facilities, which meet Orange County Public School’s Criteria, Design Standards, and assigned educational program requirements. Major elements of the project include: A. Preparation of newly developed site for building pad. B. Construction of a new, multi-story prototype school building, approximately 88,900 gross square feet, with the following spaces: classrooms, skills/resource labs, art, music, administration, kitchen, a dining/multi-purpose room, a media center, and support spaces. C. Construction of new outdoor amenities such as a new PE pavilion, a PE Office, toilets, PE storage, multi-purpose fields, hard courts, and playgrounds. D. General scope items within the site package include, but aren’t limited to: new parking areas, a parent loop, a bus loop, play amenities, exterior walkways and canopies, underground utilities, a storm water drainage system, landscaping, irrigation, and site lighting. Off-site requirements may include providing turn lanes into the school, flashing beacons and crosswalk(s). E. The new facility shall accommodate 837 student stations F. Pre-Construction Phase Services shall include but are not limited to: attending any and all design and pre-construction conferences, assisting and cooperating with the Design Professional with respect to the design of the Project, reviewing and commenting on design documents, constructability review, advertising & conducting pre-bid conference, providing cost estimates & GMP development, preparing construction schedule and incorporating design schedule into a single project schedule, refining general requirements and general conditions, and documenting “as-is” conditions (including offsite and onsite utilities from which connections are to be made.) G. Construction Phase Services include, but are not limited to furnishing and paying for all management, supervision, financing, labor, materials, tools, fuels, supplies, utilities, equipment and services of every kind and type necessary to diligently, timely and fully perform and complete the construction of the entire Project in a good and workmanlike manner in accordance with the Construction Documents. The estimated construction cost is not to exceed $21,000,000. The Construction Management firm is to provide all professional services to deliver to the owner a safe, finished, and fully functioning Elementary School Facility within the estimate construction budget. Goal: LDB:10% VBE:3%

Details

Elementary School, New Construction, 10.72 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents