Similar Projects
New Lewis C. Cassidy Elementary School
New Construction
Conception
$30,000,000 est. value
Philadelphia, PA

Ethan Allen Elementary School Major Renovation & Addition
Renovation, Addition
Design
Philadelphia, PA

James Rhoads Elementary School Major Renovations
Renovation
Design
Philadelphia, PA 19139

Addition And Major Renovation At Rhawnhurst Elementary School - General
Renovation, Addition - 60,712 SF
Bidding
$12,518,021 est. value
Philadelphia, PA

Montessori Initiative for Education
Renovation, Addition - 19,795 SF
Bidding
Philadelphia, PA 19142

Interior Alterations at Mariana Bracetti Academy Charter School`s Annex
Renovation
Post-Bid
Philadelphia, PA 19124

Cook Wissahickon Elementary School HVAC Replacement - General
Results
Less than $566,428 est. value
Philadelphia, PA 19128

Capital Program Management
Term Contract
Results
Philadelphia, PA

James J. Sullivan Elementary School Classroom Modernization- General Contract
Construction
Less than $956,754 est. value
Philadelphia, PA 19124

Richmond Elementary School Major Renovation and Addition- General
Renovation, Addition
Construction
Less than $6,818,441 est. value
Philadelphia, PA 19134

Anne Frank Elementary School Addition & Renovation
Renovation, Addition
Design
Philadelphia, PA

Make Way For Children (Willard & Barry Schools)
Renovation
Bidding
$1,000,000 to $2,000,000 est. value
Philadelphia, PA

Francis Scott Key Elementary School Classroom Modernization- General Construction
Results
Less than $1,037,473 est. value
Philadelphia, PA 19148

Gompers Elementary School Classroom Modernization - General Construction
Construction
Less than $1,850,287 est. value
Philadelphia, PA 19131

New Thomas M. Pierce School
New Construction
Design
$30,000,000 est. value
Philadelphia, PA

Last Updated 10/09/2020 09:20 AM
Project Title

Anne Frank Elementary School Renovation and Addition - General

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19115   (Philadelphia County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method
Project Status Construction Commenced third quarter 2020
Bids Due View project details and contacts
Estimated Value $13,813,675
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Exterior work to include: Temporary shoring and selective demolition of Openings in existing building. New structural steel framing for new openings in existing walls. Removal of existing paving, excavation, new cast-in-place concrete wall and column footings, piers, and slabs, steel framed superstructure with concrete floor on metal deck, metal roof decking (including partial acoustic roof decking) with insulation and built-up membrane roofing and all associated metal coping, flashing, and trim work. Reinforced and grouted concrete masonry shear walls. Exterior walls comprised of cold formed metal framing and concrete masonry units finished with brick exterior veneer and composite metal wall panels. Built-up structural steel lintels in concrete masonry unit walls. Aluminum and glass window systems, spandrel panels, and aluminum and fiberglass-reinforced panel doors. New rooftop dunnage framing system on existing roof structure for new mechanical equipment support. Interior Work: Interior work to include: metal stairs and railings, concrete masonry unit partitions, gypsum wall board partitions, hollow metal and wood doors including frames and hardware, automatic fire curtain, glazing, resilient tile and ceramic tile flooring, carpet, rubber flooring, acoustical panel and gypsum ceilings, casework and library furniture, display boards, interior painting, signage, 2 stop elevator. Renovations: Exterior work to include: Window glazing replacement, removal, painting, and re-installation of security screens, new openings for mechanical louvers and new construction connections, aluminum, hollow metal, and fiberglass-reinforced panel, modified bitumen roof repair, and dunnage. Structural infill of existing openings in roof decks. Interior Work: Concrete masonry unit partitions, gypsum wall board partitions, hollow metal and wood doors including frames and hardware, resilient tile, ceramic tile, epoxy resin, and carpet tile flooring, acoustical panel and gypsum ceilings, casework, display boards, interior painting, signage, existing 4-stop elevator repair. Site improvements: electrical utilities, gas and water utilities, storm and sanitary sewer, fencing upgrades, new paving, concrete frost slabs, exterior plantings, painted site markings on existing asphalt.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents