Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

RFP - HVAC Repair and Maintenance Services
Term Contract
Bidding
Chicago, IL 60616

Cafeteria, Kitchen and Auditorium HVAC Improvements
Renovation
Sub-Bidding
$900,000 CJ est. value
Camp Point, IL 62320

Water Heater Replacement at Indian Hills (IL 16-1)
Renovation
Sub-Bidding
$3,000 CJ est. value
Quincy, IL 62301

HVAC Service Contract
Alteration
Post-Bid
Oak Park, IL 60304

2022 Four Schools (Chiller Pre-Purchase)
Alteration
Post-Bid
Mount Prospect, IL 60056

Des Plaines HVAC Improvements
Results
Des Plaines, IL

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Results
Hines, IL 60141

2022 Summer Work - Bid Period 002 - Mechanical Equipment
Alteration
Post-Bid
Winnetka, IL

HVAC Replacement Arlington Heights Memorial Library
Results
Arlington Heights, IL

HVAC Equipment Pre-Purchase
Alteration
Post-Bid
IL

Replace Split System Condensing Unit at Pace Northwest Division
Results
Arlington Heights, IL

2022 ESC - HVAC Equipment Pre-Purchase
Alteration
Post-Bid
Skokie, IL

J041--Repairs need to HVAC System(578)
Term Contract
Results
Hines, IL

Adams County Health Department HVAC Replacement
Alteration
Post-Bid
Quincy, IL 62301

Last Updated 04/11/2023 12:38 AM
Project Title

Miscellaneous Cooling Tower and Structural Work School District 308

Physical Address View project details and contacts
City, State (County) Oswego, IL 60543   (Kendall County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $283,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Owner will receive bids for the construction of Cooling Towers, Steel and other miscellaneous work. The Work will include: Base Bid, Thompson Junior High School: Remove and replace the existing ground mounted cooling tower. Alternate Number One, Bednarcik Junior High School: Refurbish the existing cooling tower support framing. Alternate Number Two, Wheatlands Elementary School: Remove the existing cooling tower and replacing it with a new one. Replace existing structural support framing. The Work will commence on November 28, 2022, A Bid security in the amount of 10 percent of the total Bid is required. The Owner reserves the right to reject any and all bids and to waive any errors, omissions or irregularities in the bids or the bidding procedure when, in the opinion of the Owner, such action will serve its best interests. Any bid which is not accompanied by the required bid security or by any other documents or certifications required by the Bidding Documents, and any bid which is in any way incomplete or irregular, is subject to rejection at the sole discretion of the Owner. Prevailing wage rates will apply and must be included in the Bid amount.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents