Similar Projects
St. Paul Elevated Tank Rehabilitation and Painting
Infrastructure, Alteration
Bidding
Saint Paul, MO

Construction of Water System Improvements
Infrastructure, Alteration
Bidding
Clarkton, MO

Water Distribution, Supply, and Storage Improvements
Infrastructure
Post-Bid
Urbana, MO

Cameron Pipeline (Contract 2)
New Construction, Infrastructure
Post-Bid
Cameron, MO

Water Storage Tank Maintenance and Lindenwood New Tank Interior Renovation
Results
Saint Charles, MO

Sunset Elevated Tank Replacement
Results
Saint Louis, MO 63127

Phase 4 Distribution System Improvements
Renovation, Infrastructure, Alteration
Bidding
Kahoka, MO

Cameron Pipeline (Contract 3)
Infrastructure
Post-Bid
Cameron, MO

North Elevated Water Tower Valve Vault Replacement
Infrastructure
Results
Kirksville, MO

Deep Well and Water Storage Tank Phase II
Infrastructure
Bidding
Marthasville, MO

500,000 Gallon Ground Storage Water Tank Painting and Repairs
Infrastructure, Alteration
Results
O Fallon, MO

Central Office Central Lab Deaerator Tank Replacement
Alteration
Results
Jefferson City, MO

North Water Tower Clean, Repair and Paint
Infrastructure
Results
Camdenton, MO 65020

Water System Improvements - 40,000 Gallon Elevated Tank
Infrastructure
Results
MO

Elevated Storage Tank
Infrastructure
Results
MO

Last Updated 01/19/2022 12:08 PM
Project Title

Water Tower Re-Coatings

Physical Address View project details and contacts
City, State (County) Lees Summit, MO   (Jackson County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work for the project, Water Tower Re-Coatings: Scherer and Woods Chapel Manual, includes, but is not necessarily limited to: The project consists of the work associated with re- coating/over-coating two (2) water towers in the City of Lee's Summit, Missouri. Scherer Water Tower and Woods Chapel Water Tower. The site is located in Lee's Summit, Missouri

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents