Similar Projects
Unit 53 Arden - Parcels J, G-South and I-South Public Improvement Project
Bidding
North Palm Beach, FL

Shore Protection Project (SPP) Mid-Town Segment and Phipps Ocean Park (Reach 7) Beach Renourishment 2019
Post-Bid
$10,000,000 to $25,000,000 est. value
Palm Beach, FL 33404

Lake Okeechobee S-191 Basin Surface Runoff Phosphorus Removal Using Innovative Technologies
Post-Bid
Less than $3,000,000 est. value
West Palm Beach, FL 33401

SE Florida Sediment Morphodynamics
Results
Everglades, Lake Worth, Miami, Palm Beach, FL 32207

Shore Protection Project Jupiter Carlin Segment Beach Renourishment, Palm Beach County, Florida
Results
$10,000,000 to $15,000,000 est. value
Jupiter, FL

Osceola Park Neighborhood Improvements (Phase II)
Post-Bid
Delray Beach, FL

Wildflower Sewall Replacement
Results
Less than $1,550,000 est. value
Boca Raton, FL 33432

Original Section Drainage Improvements Phase 7
Post-Bid
$250,000 est. value
Greenacres, FL 33463

CEPP New Waters STA-2 Distribution Canal Clearing, Grubbing and Muck Removal
Results
$2,532,000 to $2,799,000 est. value
West Palm Beach, FL 33406

SE 8th Court Drainage Improvements
Post-Bid
$220,431 est. value
Delray Beach, FL

Construction and Installation of a Fully Functional Culvert Outfall System within the Lake Worth Drainage District E-1W-S Canal
Results
Delray Beach, FL 33484

Osceola Park Neighborhood Improvements (Phase 1)
Results
Less than $5,000,000 est. value
Delray Beach, FL 33444

Stormwater Retaining Wall and Drainage Improvements
Results
FL 33469

Original Section Drainage Improvements Phase 6
Results
Greenacres, FL 33463

STA-1E Western Flow-Way Modifications - Imported Soil
Results
Less than $30,000,000 est. value
West Palm Beach, FL 33406

Last Updated 10/21/2020 04:16 PM
Project Title

Shore Protection Project (SPP), North Boca Raton Segment, Beach Renourishment 2019, Palm Beach County, Florida

Physical Address View project details and contacts
City, State (County) Palm Beach, FL   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,000,000 to $14,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DESCRIPTION OF WORK: Project work consists of the reconstruction of a portion of the federally authorized project to restore the project area to pre-storm conditions. The project will consist of the placement of beach quality material along 1.45 miles coastline as shown on the drawings. The design cross section of the project includes an upper flat berm, lower sloped berm, and foreshore berm. The upper flat berm ties into the existing back berm at elevation +7.5 feet NAVD and extends the berm crest at elevation of +7.5 feet North American Vertical Datum 1988 (NAVD) at the Construction Baseline (CBL) or specified distance from the CBL. The lower sloped berm ties into the berm crest at elevation 7.5 feet NAVD and slopes downward on a 1-foot vertical on 100-feet horizontal (1V:100H) to elevation +6.5 feet NAVD88. The foreshore berm meets sloped berm crest at elevation +6.5 feet NAVD and slopes down to existing grade on a 1V:15H slope. Half-a-foot tolerance above the required is provided for a fill tolerance. The Borrow source for the project is approximately ½ mile offshore and 3 miles north of the placement area. Access to and from the borrow area is limited thru designated ingress and egress areas shown on the plans due to extensive offshore hardbottoms. The borrow area has two dredging cuts: Western cut (Section 1) and Eastern Cut (Section 2) where dredging will commence at the eastern cut to 95% of the target depth volume shown on the drawings before proceeding to Western cut. Work also includes endangered species monitoring, screening for rock, vibration controls and monitoring, turtle trawler mobilization/demobilization, and relocation trawling. The dredge shall be load-line Coast Guard Certified.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents