Similar Projects
Sunshine Villas
New Construction
Conception
Homestead, FL 33032

SOMI Apartments
New Construction - 255,000 SF
Conception
Miami, FL

Modern at Coconut Palm
New Construction - 20,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Homestead, FL 33032

The Palms Villas
New Construction
Design
Homestead, FL

Construction - Phase 5 & Phase 6
Post-Bid
Homestead, FL

Ludlam Trail - Phase I
New Construction
Post-Bid
Miami, FL

SEOPW CRA Quadplex
Results
Miami, FL 33136

Redevelopment of The Rucks Park Site
Results
North Miami, FL

Mandarin Parc
New Construction - 209,760 SF
Construction
Homestead, FL 33032

Tropical Breeze Townhouses
New Construction - 30,000 SF
Construction
Princeton, FL

Village at Old Cutler
New Construction
Pending Verification
Miami, FL 33190

Kingman Gate Community
New Construction
Conception
Homestead, FL

Biscayne Park Villas
New Construction - 25,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Douglas Enclave
New Construction
Post-Bid
Miami, FL 33125

Development of the Collins Park Artist Workforce Housing Project
Results
Miami Beach, FL

Reported 10/04/2019 12:00 AM
Project Title

Construction of Multi-Family Workforce Housing, Related Parking Improvements and Redevelopment of an Associated Site for Public Park Use

Physical Address View project details and contacts
City, State (County) Hialeah, FL   (Miami-Dade County)
Category(s) Residential
Sub-Category(s) Multi-Family Homes
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Construction of new multi-family workforce housing to be developed and operated on real property owned by the City (the "Site"), related parking improvements to serve the new workforce housing units, and redevelopment and improvement of an associated site (the "Associated Site") for public park use (collectively, the "Project"). The Site is approximately 2.21 acres and currently serves as surface parking for the Palm Center Apartments. The Associated Site is known as Triangle Park, a public park of approximately 1.86 acres.
Details
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents