Similar Projects
New Asphalt Shingle Roofing System
Renovation
Sub-Bidding
$130,000 CJ est. value
Grafton, MA 01519

Roof Replacement
Renovation
Sub-Bidding
$873,720 CJ est. value
Milford, MA 01757

Roofing, Insulation, Siding Phase 2 - General Bids
Alteration
Post-Bid
$580,000 to $485,000 est. value
Winchendon, MA 01475

Roofing, Insulation, Siding Phase 2 - Filed Sub Bids
Alteration
Post-Bid
$580,000 est. value
Winchendon, MA 01475

Schools Roofing Repairs
Alteration
Results
Southbridge, MA 01550

North Oxford Fire Station Roof Replacement
Alteration
Results
$160,000 est. value
Oxford, MA 01537

Roof Replacement Public Safety Building
Alteration
Post-Bid
$200,000 est. value
Westminster, MA

Aubuchon Hall Envelope Repairs - Filed Sub Bids
Alteration
Results
$400,000 est. value
Fitchburg, MA 01420

Roof Replacement Project
Alteration
Post-Bid
$5,000,000 est. value
Worcester, MA 01606

Municipal Building Roof Replacement
Alteration
Results
$373,800 est. value
Shrewsbury, MA 01545

Probation Unit Roof Replacement
Alteration
Post-Bid
Milford, MA

Roof Replacements
Alteration
Results
Milford, MA

Roof Replacement Shrewsbury Municipal Building
Alteration
Post-Bid
$373,800 est. value
Shrewsbury, MA 01545

Roof Restoration Airport Hangars
Alteration
Results
$100,000 est. value
Fitchburg, MA 01420

North Grafton Elementary School Gymnasium Roof Replacement
Renovation
Post-Bid
$293,000 CJ est. value
North Grafton, MA 01536

Last Updated 05/06/2023 03:33 AM
Project Title

Maintenance Barn Roof Replacement

Physical Address View project details and contacts
City, State (County) North Grafton, MA 01536   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $130,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of in general, demolition and removal of existing slate shingle roofing system to the existing wood plank deck. There are three existing roof ventilation cupola s which requires two to be removed and re-framed for new plywood roof deck and one remaining to be re-built and new roofing and siding installed. Many of the roof rafter tails are deteriorated and needs to have sistered rafter ends installed. The entire roof shall have a new plywood overlay installed with ice and water membrane and new three-tab asphalt shingle roofing system installed. Valley flashing shall be ice and water membrane with new aluminum flashing. The rafter ends shall have new PVC trim fascia board with aluminum drip edge. No work is intended within the building.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents