Similar Projects
Condenser Water Filtration System Upgrade
Bidding
San Antonio, TX 78226

Repair and Maintenance Services Air Cooled Scroll Chillers
Term Contract
Bidding
San Antonio, TX 78229

Cooling Towers Cleaning Services - BESD
Post-Bid
San Antonio, TX 78200

Mountain Valley Middle School HVAC
Post-Bid
Less than $2,700,000 est. value
New Braunfels, TX 78132

Annual Contract - Cooling Towers Cleaning Services
Term Contract
Results
San Antonio, TX

Repair HVAC, Building #1151 @ Kelly Field Annex, Joint Base San Antonio Lackland AFB
Results
$250,000 to $500,000 est. value
San Antonio, TX 78236

Exhaust Hoods Cleaning & Certification Services
Bidding

Burning Tree Apartments Exterior Improvements and New HVAC and Water Heaters
Post-Bid
$2,700,000 to $3,700,000 est. value
San Antonio, TX 78247

WSD SAT CR3 Upgrade
Results
San Antonio, TX 78226

San Antonio GM HVAC Replacement
Bidding
San Antonio, TX 78237

S--Exhaust Hood Cleaning Service 671-20-2-5041-0005
Post-Bid
San Antonio, TX 78229

District Cooling System Business Case Consulting Services
Results
Less than $125,000 est. value
San Antonio, TX 78212

RFI Cooling Tower
Post-Bid
San Antonio, TX

Annual Contract for Cooling Tower Service Program
Term Contract
Results
Less than $98,600 est. value
San Antonio, TX 78212

B991-Randolph Repair Cooling Tower 1
Post-Bid
Universal City, TX 78150

Reported 04/20/2021 12:00 AM
Project Title

6 Month Rental - Portable Cooling Towers

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78234   (Bexar County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall be responsible for all required materials, equipment licensed personnel in their fields of expertise (i.e. electrical and HVAC), manage, administer, and supervise the project to meet the requirement. Contractor shall rent and commission four (4) 100 Ton Portable Cooling Towers with heat exchangers for water source heat pumps for 6 months to include safety items around the portable (I.E cable covers over the electrical and cones) necessary to set up and provide a portable cooling towers for buildings 905, 915, 916, and 929. The Contractor shall be responsible for loading, unloading, complete assembly, and complete disassembly of equipment to include all routine maintenance, on equipment provided, for the duration of the 6 months.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents