Similar Projects
Ganton Parkway East Phase 2 and Ganton Parkway West Phase 1
Bidding
$6,570,000 est. value
New Albany, OH 43054

Fabrication and Delivery of Precast Boxes, Wingwalls and Headwalls
Post-Bid
Columbus, OH 43215

Center Street Public Space, Parking Lot, and Trailhead Improvements (CIP LB-17)
Post-Bid
Less than $815,500 est. value
Hilliard, OH

Bixford Green Trail
Results
Less than $110,368 est. value
Groveport, OH 43125

Box Culverts
Results

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Akron, Athens, Avon, Bellefontaine, Cincinnati, Columbus, Defiance, Huber Heights, Kent, Marietta, Mason, Saint Clairsville, Sidney, Wadsworth, Wheelersburg, Xenia, Youngstown, OH

Concrete Pipes
Results

Precast Concrete Headwalls
Post-Bid

Red Lot Improvements
Results
Less than $355,133 est. value
Columbus, OH

Olentangy Trail - Northmoor Park to Clinton Como Park
Post-Bid
Columbus, OH

Kahler Tile Replacement Drainage Improvement Plan
Results
Less than $634,263 est. value
Columbus, OH 43215

Grandview Heights Signals Interconnect
Post-Bid
Less than $1,156,318 est. value
Grandview Heights, OH 43212

Hayden Run Central Ohio Greenways Trail Improvements
Results
Less than $105,000 est. value
Columbus, OH 43215

Northwest Stormwater Study 611721-100000
Post-Bid
Columbus, OH

Northam Road Shared Use Path
Results
Less than $251,669 est. value
Upper Arlington, OH

Last Updated 05/12/2021 04:08 PM
Project Title

Pedestrian Safety Improvements - John H Mcconnell Boulevard Sidewalk

Physical Address View project details and contacts
City, State (County) Columbus, OH 43215   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves constructing sidewalk along the west side of John H McConnell Blvd from the northern terminus of 3293-E north of Spring Street to New Public Lane. Improvements will include curb ramps, curb, retaining wall, street trees, lighting and may include storm water drainage improvements, and other such work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents