Similar Projects
Treetops Phase III
New Construction, Infrastructure
Conception
$30,000,000 est. value
Macon, GA 31220

SR 11 Fm 0.16 Mi S of Woodlawn Dr / Bibb to 0.02 Mi S of SR 22
Infrastructure, Alteration
Design
$6,000,000 est. value
Macon, GA 31206

Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
$250,000 to $500,000 est. value
Camp Lejeune, Jacksonville, NC

SR26 Five Points Fire Station Driveway
Infrastructure
Bidding
$400,000 est. value
Macon, GA

Deep Patch with Asphalt Resurfacing Projects
Infrastructure
Post-Bid
GA

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

4.588 Miles of Widening and Reconstruction
Results
GA

10.101 Miles of Milling, Inlay and Plant Mix Resurfacing on SR 57 Beginning East of SR 19 And Extending to the Wilkinson County Line
Results

2021 SPLOST Milling and Resurfacing of Various Streets in Commission Districts 1 and 2
Results
Ellenwood, Forest Park, Lawrenceville, Macon, Morrow, Rex, Riverdale, Stockbridge, Union City, Warner Robins, Woodstock, GA 30294

Richland Creek Reservoir Entrance
Results
Less than $289,298 est. value
Cartersville, GA 30120

2021 LMIG Project
Results
Mount Vernon, GA

5.206 Miles of Milling, Inlay and Plant Mix Resurfacing on Sr 247 Beginning North of Us 41 Bus/Sr 49 and Extending South of Us 41/Sr 19
Results
GA

2021 LMIG Project - Brooks Road
Results
$1,200,000 est. value
Macon, GA 31204

T32-D3-PCC-SR 74 Bibb-118893
Results
GA

T32-D3-Pavepres-SR 87 Bibb-122078
Infrastructure
Results
est. value
GA

Last Updated 07/10/2022 11:23 PM
Project Title

Mountain Bike Track

Physical Address View project details and contacts
City, State (County) Macon, GA   (Bibb County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Build up to 2.12 total miles of a new multi-use (biker, hiker use) trail. 2. Full - bench construction will be used in the completion of this project. 3. All work identified in this bid shall be completed by the successful bidder and shall include all necessary materials, labor, equipment, tools, insurance, permits and fees(if any) needed to complete the specified work. 4. Contractor will clean site and remove all trash and related materials left over from the project. 5. Successful bidder will also provide on - site service to include marking the layout of the trail and it's many features. 6. Please reference pages 2 and 3 of plans for further and more detailed scope of work. 7. All paved and connector trails planned for future use please don't include items in the cost. No pump track concession stand or playground at this time.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents