Similar Projects
Clarkrange Regional Business Park Lots 3 and 4 - Grading
Infrastructure
Bidding
Clarkrange, TN 38553

Algood Park – Phase 1
New Construction
Bidding
$800,000 est. value
Algood, TN

FY20 Sidewalks Contract
Post-Bid
Chattanooga, TN 37402

Area 3 Streetscape - Glass and Dodson
Post-Bid
Chattanooga, TN 37400

Caine Lane Greenway
Results
Less than $712,713 est. value
Chattanooga, TN 37400

South Chickamauga Creek Greenway - Youngstown Connector
Results
Less than $1,913,913 est. value
Chattanooga, TN

RTP Walking Track Improvements
Infrastructure
Bidding
$160,000 est. value
Harrison, TN

Brownfield Cleanup at Former Glover Tract- Riverwalk Trail
Post-Bid
Chattanooga, TN 37400

UTC West Campus Housing Pedestrian Plaza
Results
Chattanooga, TN

Crenshaw Library Parking Lot Improvements
Infrastructure
Bidding
Memphis, TN 38126

Broad Street Sidewalk Repair
Post-Bid
Chattanooga, TN 37402

Construction of Sidewalks
Results
Less than $1,191,205 est. value
Red Bank, TN 37415

Holly Tree Sidewalk
Infrastructure
Bidding
White House, TN

Construction of a New Parking Lot
Post-Bid
Cleveland, TN 37320

CDBG Sidewalk Install/Repair
Results
Less than $907,898 est. value
Chattanooga, TN

Last Updated 07/29/2021 06:21 AM
Project Title

Dogwood Manor Parking Lot Repair

Physical Address View project details and contacts
City, State (County) Chattanooga, TN 37402   (Hamilton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Supply all materials, equipment, and labor to repair, seal, and re-stripe the parking lot at the CHA’s Dogwood Manor located at 959 Gateway Avenue, Chattanooga, TN 37402. The single highrise building will remain occupied with residents and the successful contractor will be required to complete the work in phases as vehicles will continue to have to use the parking areas while work is performed. Usually there are sufficient additional parking spaces so current vehicles can be moved and parked in different areas for the phasing process The scope of work must include repair of existing cracks in pavement, proper cleaning of debris and removal of oil stains, priming as needed, etc. prior to applying two (2) coats of sealer and re-stripping the parking lot similarly as it currently exists.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents