Similar Projects
Eagles Nest Senior Care
New Construction, Infrastructure - 94,822 SF
Conception
$311,000,000 CJ est. value
Milton, DE 19968

SE Regional Pump Station and Force Main - East of Route 1 - City of Milford
Infrastructure
Conception
$1,500,000 CJ est. value
Milford, DE 19963

Turnberry - Unity Branch Subdivision
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Harbeson, DE 19951

Royal Farms #428 / Milton
New Construction, Infrastructure - 5,100 SF
Design
$1,400,000 CJ est. value
Milton, DE 19968

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

KAMM Properties Site Development
New Construction, Infrastructure
Post-Bid
Bethany Beach, DE

Dune Walkway Construction and Replacement
Results
South Bethany, DE 19930

Reseal and Paint Lines to 6,000 Sq Ft of Parking Lot
Term Contract
Results
DE

Dairy Queen At Georgetown Plaza
New Construction, Infrastructure - 2,279 SF
Construction
$700,000 CJ est. value
Georgetown, DE 19947

Fancy Pants Retail Building / Lewes
New Construction, Infrastructure - 2,400 SF
Construction
$700,000 CJ est. value
Lewes, DE 19958

Black Hog Village Retail
New Construction, Infrastructure - 21,818 SF
Pending Verification
$4,000,000 CJ est. value
Lewes, DE 19958

Black Hog Village Retail
New Construction, Infrastructure - 21,818 SF
Pending Verification
$4,000,000 CJ est. value
Lewes, DE 19958

Runway 4-22 Taxiway B - Sussex County
Infrastructure
Conception
$9,750,000 CJ est. value
Georgetown, DE 19947

Fairmont Autumdale Subdivision
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Harbeson, DE 19951

Conwell Street Green Infrastructure Installation
Infrastructure
Post-Bid
Seaford, DE

Last Updated 05/05/2023 05:04 AM
Project Title

Woolford Street Improvements

Physical Address View project details and contacts
City, State (County) Seaford, DE 19973   (Sussex County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

WOOLFORD STREET IMPROVEMENTS CITY OF SEAFORD DELAWARE CONTRACT DURATION: 90 CALENDAR DAYS Work consists of the following: furnishing and installing approximately 290 linear feet of 15-inch RCP storm drain including 7 vertical feet of catch basins; 4,110 square feet of concrete sidewalk; 3 ADA ramps; 1,855 square yards of Bituminous Concrete Type C; 250 square yards of Bituminous Concrete Type B; 2,171 square yards of profile milling; 1,118 lineal feet of Type 1-4 curb; 320 lineal feet of Type 1-6 curb; striping and thermoplastic crosswalks; signage; and restoration. No Bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. The right is reserved, as the interest of the City of Seaford may appear, to reject any and all bids, to waive any informalities in bids received, and to accept or reject any items of any bid. Contractors who submit a bid on this project shall be qualified and experienced in projects of similar size, type and complexity. Each BID must be accompanied by a Contractor Qualification Statement, which shall present evidence of successfully completing three (3) or more similar construction projects within the last five (5) years. Provide project name and location, owner contact information, project description, change order history, construction cost and completion date. Contractors who submit a bid on this project must note the soonest acceptable date of Notice to Proceed on the BID FORM. Contractor schedule can factor into bid award decision. The OWNER desires work to be completed while nearby schools are vacant for summer break. Current Delaware State Prevailing Wage Rates apply on this project and are contained in the Bidding Documents. The Mayor and Council reserve the right to reject any and all bids.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents