Similar Projects
Airport Pump Station Pump 5 and Motor Installation
Results
West Jordan, UT 84088

Rosecrest Pump Station Improvements Project
Results
Less than $998,000 est. value
Herriman, UT 84096

Zone 2 and 3 Pump Station and Pipeline Project
Post-Bid
Herriman, UT 84096

Stonebridge Maintenance Variable Speed Pump Station Replacement
Post-Bid
West Valley City, UT 84120

6200 South Zone C Pump Station
Term Contract
Post-Bid
West Jordan, UT 84081

20D: Kent Booster Pump Station Replacement Project Contractor Prequalification
Renovation
Post-Bid
West Valley City, UT 84120

River Oaks Pump Station
Results
Sandy, UT

Pump Replacement for JBM Pump Station
Results
Less than $198,844 est. value
Herriman, UT

Welby Pump Station Canal Turnout and Storm Drain Sleeve
Results
South Jordan, UT

Industrial Lift Station Rehab and Piping Upgrades
Post-Bid
Salt Lake City, UT

15000 South PI Pump Station
New Construction
Results
Less than $500,000 CJ est. value
Bluffdale, UT 84065

900 North Lift Station Rehabilitation
Results
Less than $1,257,000 est. value
Salt Lake City, UT 84115

20E Pioneer WWPS Replacement Project
Renovation
Post-Bid
$1 to $3,400,000 est. value
West Valley City, UT

New Rose Park Lift Station Replacement (SS02)
Results
Less than $419,000 est. value
Salt Lake City, UT 84116

SLC WRF Influent Pump Rebuild Project
Results
Less than $369,000 est. value
Salt Lake City, UT

Last Updated 09/28/2021 09:32 AM
Project Title

5th and U Pump Station Improvements and Backup Power

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84103   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,035,675
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to, the following: Installation of a backup generator with generator housing structure, raised concrete equipment pad, transfer switch, motor controllers, 16” waterline and valves, flow meter, curb and gutter, and improvements to the existing water pump station. The location of the work is: 5th Ave and U St in Salt Lake City, UT, 84103.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Packaged Generator Assemblies.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents