Similar Projects
Straits Fishing Pier Replacement
Post-Bid
Beaufort, NC 28516

Provide Shoring Systems Columns
Post-Bid
$25,000 to $100,000 est. value
Cherry Point, NC 28533

Repairs to North Topsail Beach Access Sites #1, #2
Results
Less than $99,744 est. value
North Topsail Beach, NC

Fonta Flora State Trail - Linville Access Boardwalk
Results
NC

Major M & R of Concrete Wharf at USCG SFO Fort Macon, Atlantic Beach, NC
Post-Bid
$1,000,000 to $5,000,000 est. value
Atlantic Beach, NC 28512

Demolition and Replacement of the Park Street Pier - Hurricane Florence Damages
Results
Emerald Isle, NC

New River Waterfront Park Repairs
Post-Bid
Less than $500,000 est. value
Jacksonville, NC 28540

Demolition and Replacement of the EI Woods Pier - Hurricane Florence Damages
Results
Emerald Isle, NC

Repair Multiple Docks
Post-Bid
$100,000 to $250,000 est. value
Cherry Point, NC

Demolition and Replacement of the Cedar Street Pier - Hurricane Florence Damages
Results
Emerald Isle, NC

Dowdy Park Phase III
Post-Bid
Nags Head, NC

Repairs to North Topsail Beach Access Site #4
Results
North Topsail Beach, NC

FY 20/21 Capital Improvement Project Admiral Street Public Beach Access
Post-Bid
Nags Head, NC

Dolphin Piling Repair at Elizabeth II for Roanoke Island Festival Park
Results
Less than $22,000 est. value
Manteo, NC 27954

Poe`s Ridge Boat Ramp Area Site Preparation
Post-Bid
$25,000 est. value
Moncure, NC 27559

Reported 04/17/2020 12:00 AM
Project Title

Cedar Island Dock Repairs

Physical Address View project details and contacts
City, State (County) Cedar Island, NC 28516   (Carteret County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bulkhead: The Contractor shall remove and replace fifty-six (56) 2in x 8in, 8ft wooden retaining boards, remove and replace two (2) 2in x 4in, 12ft walers, remove and replace one (1) 2in x 8in, 8ft top cap, remove and replace three (3) 2in x 4in, 11ft top caps, remove and replace six (6) 6in x 6in, 10ft support piles and remove and replace five (5) of ½ inch tieback rods with deadmen assemblies, 10ft long. Dock: The Contractor shall remove and replace approximately one hundred and thirty (130) 2in x 8in, 12ft long wooden deck boards, remove and replace twenty-two (22) 2in x 8in, 12ft wooden beams, remove and replace fifty-five (55) 2in x 8in, 12ft wooden stringers, remove and replace twenty-two (22) 2in x 8in, 12ft wooden crossmembers and remove and replace one (1) 6in x 12ft support pile. Hardware: The Contractor shall use galvanized joist hangers, hurricane clips, bolts, screws, nails and any other associated hardware. Soil: The Contractor shall remove any existing and associated debris from the dock area, clean where land has eroded and use approximately 137CY of unclassified fill to backfill the 137ft long x 9ft wide x 3ft deep area.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents