Similar Projects
Pleasure Bay Crossing and Main Pump Station Replacement
Design
$20,000,000 est. value
Monmouth Beach, NJ 07750

West Main Street Sanitary Pump Station Improvements Phase 1
New Construction, Infrastructure
Bidding
$116,000 est. value
High Bridge, NJ

Valley Road Corrosion Control Chemical Feed System Phase II
Renovation
Bidding
Montclair, NJ 07043

Diamond Drive Pump Station Rehabilitation
Post-Bid
Waretown, NJ 08758

2020 Proposal Influent Grinders for Wastewater Stations
Term Contract
Post-Bid
Somers Point, NJ 08244

Maintenance and Repair of Sewer Lift Stations
Term Contract
Results
$175,000 est. value
New Brunswick, NJ 08901

Pump Station No.10 Manhole and Pipe Rehabilitation and Bypass Pumping
Results
South Brunswick, NJ

Upgrades and Improvements to Country Estates Unmanned Sewer Pump Station - 215
Renovation
Bidding
Mount Holly, NJ

2020 Proposal Sewer Pump Station Maintenance
Term Contract
Post-Bid
Somers Point, NJ 08244

Replacement of Briggs Road and Library Pump Station Force Main Connections
Results
$800,000 est. value
Masonville, NJ 08054

Atrium and Hooton Pump Station Upgrades
Renovation
Bidding
$1,200,000 est. value
Willingboro, NJ

Grandview Pump Station Improvements
Post-Bid
Thorofare, NJ 08086

Moonachie Avenue Pumping Station Comminutor Replacement
Results
Moonachie, NJ 07074

Sanitary Sewer Pump Station Maintenance
Post-Bid
New Brunswick, NJ 08901

Repair of a 600HP Motor Manasquan River Intake Pump Station Manasquan Water Supply System
Results
Wall, NJ 07727

Last Updated 09/14/2021 10:41 AM
Project Title

Shrewsbury Avenue Pump Station Upgrades

Physical Address View project details and contacts
City, State (County) Tinton Falls, NJ 07724   (Monmouth County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of Work contemplated for the above named Project includes various upgrades to the existing pump station including pump equipment and piping replacement, electrical controls improvements, and various site improvements, as well as all other Work of any type or description necessary for contemplation of the Project, whether or not specifically described in these Contract Documents.

Details

Lift and Pump Stations, Addition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents