Similar Projects
DET Circuit Breaker Testing and Cleaning
Bidding
Madison, WI

Lakeview Library Lighting Upgrade
Bidding
$80,000 est. value
Madison, WI 53704

South Fork Substation MV Circuit Breakers
Post-Bid
River Falls, WI

Install Outlets Bldg 2187 in Hallway Between Rooms. 123 & 128 and in Rooms 121, 127, 129, 132, 133 (Wo 1956)
Post-Bid
Less than $25,000 est. value
WI 54656

Redundant UPS System Installation
Results
Less than $120,000 est. value
Whitewater, WI 53190

Switchgear Breaker Upgrades
Results
Less than $230,000 est. value
Madison, WI 53704

Electrical Distribution System Testing & Inspection
Term Contract
Bidding
Milwaukee, WI 53295

Uninterrupted Power Supply (UPS) and Batteries
Post-Bid
Sparta, WI 54656

2020 Public Works Garage Lighting Upgrades
Results
Less than $25,000 est. value
Monona, WI 53716

Arts Sculpture Laboratory - MEP
Bidding
$2,020,000 est. value
Whitewater, WI 53190

Replace Electrical-Building 19 607-19-107
Post-Bid
$2,000,000 to $5,000,000 est. value
Madison, WI

LED Lighting Upgrades
Results
New London, WI 54961

Electrical Services
Term Contract
Bidding
Green Bay, WI

Electrical Services
Term Contract
Post-Bid
Milwaukee, WI 53202

Utility Renovations - Mechanical
Results
Less than $3,000,000 est. value
Madison, WI 53703

Reported 12/11/2020 12:00 AM
Project Title

Fire Station 53 Emergency Generator Replacement (Install)

Physical Address View project details and contacts
City, State (County) Elm Grove, WI 53122   (Waukesha County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The selected contractor shall furnish all labor, material and equipment necessary to remove an existing diesel powered 30KW generator located at City’s Fire Station 53, 10525 Watertown Plank Road, Wauwatosa, WI, and installation of a new, City furnished, Natural Gas, Kohler Model 30 CCL and two (2) automatic transfer switches (ATS). The project includes moving existing loads to a separate transfer switch, relocating the new unit outdoors on a new, contractor provided, concrete pad, coordination with WE Energies in extending existing supply line(s) to the new location and additional upgrades to the service if required. The completion date of the work shall be May 30, 2021

Details

Division 26 - Electrical, Packaged Generator Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents