Similar Projects
Salmon River Central School District- Capital Project - Phase 5 - Mechanical
Renovation
Design
$143,000 CJ est. value
Fort Covington, NY 12937

Town Building Updates and Repairs - Mechanical Construction
Term Contract, Renovation
Design
$900,000 CJ est. value
Scipio Center, NY 13147

2022 Secure Entrance Project
Renovation
Sub-Bidding
$600,000 CJ est. value
Scottsville, NY 14546

DMV / Board of Elections Addition / Renovation
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
Lowville, NY 13367

Public Safety Building Boiler Replacement
Post-Bid
Lowville, NY 13367

Administration Building Boiler 1 Gasket Replacement
Post-Bid
Latham, NY 12110

Cemline V200swh624, Steam Powered Water Heater
Results
Great Neck, NY 11024

2021 - 2025 Heat and Hot Water Services
Results

2020 Capital Improvement Project Phase 1B - Building Improvements Contract 8: Early Learning Center - Mechanical Construction
Renovation
Construction
$250,000 CJ est. value
Poughkeepsie, NY 12601

2021 Capital Improvement Project - Mechanical Contract
Renovation
Sub-Bidding
$200,000 CJ est. value
Watertown, NY 13601

Seasonal Inspection, Diagnostic and Repair Services for the Hot Water Boilers at Fulton Hall
Term Contract
Post-Bid
Kings Point, NY 11024

Robert Whalen Homes Boiler and DHW Replacement
Results
Albany, NY 12210

Building Additions and Interior Alterations at Turtle Hook Middle School - Contract M Mechanical Work
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Uniondale, NY 11553

Seasonal Inspection, Diagnostic and Repair Services for the Hot Water Boilers at Delano Hall
Term Contract
Post-Bid
Kings Point, NY 11024

Boiler and DHW Install
Results
Rochester, NY

Last Updated 09/20/2022 03:31 AM
Project Title

2020 Capital Improvement Project Phase 2 - Contract 202 - Mechanical Contract

Physical Address View project details and contacts
City, State (County) Geneseo, NY 14454   (Livingston County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The last addendum will be issued by 5:00 P.M., local time, on September 16 th , 2022. Bids shall be on the form provided in the documents, prepared in duplicate as set forth in the Instructions to Bidders and enclosed in an envelope bearing on its face the name and address of the bidder and the title of work to which the proposal relates. If submitting for more than one contract, submit each contract bid in separate envelope. Any Bidder upon returning such set-in good condition within thirty (30) days after Bid opening will be refunded the deposit. Any Bidder after thirty (30) days after Bid opening or Non-Bidder so returning such a set will not be refunded. The Board of Education hereby reserves the right to waive any informalities and reject any or all Bids or to accept the one that in its judgment will be for the best interest of the school district. A Bid Bond or Certified Check made payable to the Owner in the amount of five percent (5%) of the Bid, subject to the conditions provided in the Instructions to Bidders, must be deposited by each Bidder with his Bid as a guarantee that, in the case the contract is awarded to him, he will then, ten days thereafter, execute such contract and furnish a satisfactory Performance and Payment Bond, and the Bidder shall not withdraw his Bid for a period of forty-five days after the above date of Bid opening, and to guarantee the performance of all other obligations of the Bidders as set forth in Instructions to Bidders. Attention of the Bidders is called to the requirements as to the conditions of employment and minimum wage rates to be paid under this Contract as well as to the provisions set forth in the Instruction to Bidders. Work shall be commenced and continuously and diligently prosecuted immediately after contracts have been signed. Attention of the Bidders is called to the requirements as to the conditions of employment and minimum wage rates to be paid under this Contract as well as to the provisions set forth in the Instruction to Bidders. Work shall be commenced and continuously and diligently prosecuted immediately after contracts have been signed.

Details

Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents