Similar Projects
Banner Gilbert Medical Center Parking Lots
Design
Gilbert, AZ 85234

Research on the Impact of Diamond Grind Pavement Resurfacing on PM-10 Emissions
Term Contract
Bidding
AZ

System Preservation
Bidding
Less than $14,600,000 est. value
Avondale, Phoenix, Tolleson, AZ

Paving and Resurfacing of Streets
Post-Bid
Tempe, AZ 85280

2019 Mill and Overlay Project
Post-Bid
Scottsdale, AZ 85256

2nd Avenue Streetscape 2nd Avenue Between Morris and Robson
Results
$50,000 to $60,000 est. value
Mesa, AZ 85211

Phoenix-Casa Grande Highway (I-10) 1-17 (Split) to SR 202L (Santan)
Results
Chandler, AZ 85225

CarMax - Parking Lot
New Construction
Construction
Gilbert, AZ 85297

Riverpoint Parking Lot Addition
Addition
Construction
Phoenix, AZ 85040

35th Ave, Carver to Elliot
Bidding
AZ

Phase VII Pavement Replacement
Post-Bid
Guadalupe, AZ 85283

Rittenhouse Road Bridge at Queen Creek Wash Improvements
Results
Queen Creek, AZ 85142

Miller Road/Hayden Road: Pinnacle Peak Parkway to Happy Valley Road
Bidding
$9,470,000 est. value
Scottsdale, AZ

Update Pavement Management Program
Post-Bid
Cave Creek, AZ

Sun City Festival Ranch Planning Area 2 Parcel C2 Paving
Results
Buckeye, AZ 85326

Reported 05/06/2021 11:52 AM
Project Title

John Wayne Parkway Streetscape Improvements

Physical Address View project details and contacts
City, State (County) Maricopa, AZ   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Aesthetic improvements for John Wayne Parkway shall be constructed per project plans and details within existing right-of way for the City of Maricopa, Arizona. Improvements consist of: new irrigation, lighting, plants, trees, gabions with rip-rap, shade structures, decorative pavement, and artistic elements. Connections to utilities for water and electric are also to be completed. Street crossings will be needed to provide sleeved connections which are to be coordinated with the City.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents