Similar Projects
Wilson Road Bridge Rehabilitation Project
Results
North East, PA 16428

Bessemer Avenue Bridge Rehabilitation Project
Post-Bid
Albion, PA 16401

Central Bayfront Project - S and S
Results
$1,000,000 to $2,499,999 est. value
Erie, PA

US 6 over Keppels Run
Results
$200,000 to $499,999 est. value
PA

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

SR 3006 (Crossingville Rd.) Bridge over Marsh Run
New Construction
Results
$100,000 to $199,999 est. value
PA

Bartlett Road Bridge No. 1 Replacement Project
Results
Harborcreek, PA

Mystic Road Bridge Replacement Project
Infrastructure
Post-Bid
Waterford, PA

Major Bridge P3
New Construction
Post-Bid

SR 3017 Bridge over Temple Creek
Renovation
Results
$200,000 to $499,999 est. value
Erie, PA 16506

Erie 2022 Bridge Shotcrete Group
Renovation
Design
$380,000 est. value
Erie, PA 16511

Sr 1001 Over Tributary To Susquehanna River - 5356779
Renovation
Conception
$325,000 est. value

Southwest Of Euclid Bridge
New Construction
Design
$2,139,878 est. value

Alleghenyville Road (Sr 3024) Over I-176
New Construction
Design
$5,713,010 est. value

US 20 over CN Ridge Road (RR)
Renovation
Design
$1,550,000 est. value
Erie, PA 16506

Last Updated 07/19/2022 05:31 AM
Project Title

PA 215 - Kidders Corner Road Bridge

Physical Address View project details and contacts
City, State (County) PA   (Erie County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,499,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of removing, designing, and constructing a bridge and road over West Branch Conneaut Creek and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 215, in Erie COUNTY Conneaut TOWNSHIP from approximately segment 50 offset 0258 to approximately segment 50 offset 0858.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents