Similar Projects
Exterior Chain Link Fencing Replacement
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Indiana, PA 15701

George Wolf and Moore Elementary Schools Playground Fence Installation
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Northampton, PA 18067

Litter Fence
Alteration
Post-Bid
Saint Clair, PA

Nall Field Development - Fencing Improvements
Alteration
Post-Bid
Folsom, PA

Bldg 27A Fence NSA-P
Results
$25,000 to $100,000 est. value
Philadelphia, PA 19111

Allegheny National Forest - FY21 Marienville Ranger District Fence Construction
Results

Adams Solar Project - Fencing
Infrastructure
Pending Verification
$200,000 CJ est. value
Gettysburg, PA 17325

Temporary Construction Fence Rental
Alteration
Post-Bid
Philadelphia, PA

Construct Access Control Points East and West (Main Gate)
Term Contract
Results
$10,000,000 to $25,000,000 est. value
Annville, PA 17003

Gate Closures Evrt D2
Alteration
Post-Bid

VAC Install Safety and Security Modifications T21
Term Contract
Results
$500,000 to $1,000,000 est. value
Coatesville, PA 19320

Gate Cantilever Complete Gibs D1
Alteration
Post-Bid
Gibsonia, PA 15044

23 WHM SGL 205 Archery Range
Infrastructure, Alteration
Results
Harrisburg, PA

Chain Link Fencing - Installation and Repairs
Term Contract
Post-Bid
Philadelphia, PA

Installation and Furnishing Spillway Safety Fence at East Branch Clarion River Lake, Elk County, Wilcox, PA.
Term Contract
Results
$100,000 to $250,000 est. value
Wilcox, PA

Last Updated 02/22/2023 12:06 AM
Project Title

Allegheny National Forest Bradford Ranger District Fence Re-Construction

Physical Address View project details and contacts
City, State (County) Bradford, PA 16701   (McKean County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This contract calls for the reconstruction of existing deer ex-closure fences on the Allegheny National Forest. The fences are 8-foot woven wire fences (7 foot high with 1 foot overlap buried on the ground) and they are located in remote wooded areas in Warren, McKean, Elk, Forest Counties, Pennsylvania. The Magnitude of this project is $25,000 to $100,000. The estimated period of performance is 04/03/2023 thru 06/30/2023. A pre-proposal meeting will not be held. All technical questions shall be emailed to loren.mein@usda.gov. Response date is 02/20/2023 before 1 P.M. E.T. Quotes shall be emailed directly to Loren Mein. NO HARD COPY RESPONSES WILL BE ACCEPTED. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents