Similar Projects
Soldier Performance Readiness Center (SPRC), Multiple Locations Nationwide
- 41,700 SF
Post-Bid

Soldier Performance Readiness Center (SPRC), Multiple Locations Nationwide
- 41,700 SF
Post-Bid

Fort Custer - Construct Barracks #2564
New Construction
Results
Augusta, MI

Construct Addition to Building 1142 Grayling Army Airfield
Addition
Results
Grayling, MI 49738

FY22 USACE LRD Regional Construction Management Services Multiple Award Task Order Contract (MATOC)
New Construction, Renovation, Term Contract
Post-Bid
$200,000,000 to $300,000,000 est. value
Chicago, IL

Grand Ledge Armory - Armory Modifications
Renovation
Results
Grand Ledge, MI 48837

Reported 10/31/2021 12:00 AM
Project Title

VGLZ 112021 Repair Building 140 for MXG Simplex

Physical Address View project details and contacts
City, State (County) Harrison Township, MI 48045   (Macomb County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

VGLZ 112021 REPAIR BUILDING 140 FOR MXG: The ultimate objective is to provide a complete and usable facility to house the 127 MXG Command/ Administration and the Maintenance Operations Flight (MOF) while meeting all applicable codes and regulations including Department of Defense (DoD) Antiterrorism/ Force Protection requirements and Air Force Instruction (AFI) 32-7065. This project will include the repair of supporting utilities, infrastructure, communications, fire protection, and site improvements. The 8,001 square foot Building 140 was built in 1934 and is eligible to be on the National Register of Historical Properties. The comprehensive repair by renovation will also provide for the complete replacement of the building’s fire annunciation system which will include the provision of a Simplex Fire Alarm System. The incorporation of the Simplex Fire Alarm System for the subject project is required for the following reasons: The existing base-wide Simplex Fire Alarm System Monitoring shall tie into this new fire alarm and mass notification system. Simplex programming logic is a specific protocol language and is not accessible to other manufacturers of fire alarm system. Additional (estimated) costs will be associated to establish a second fire alarm system on the installation. A second system would be required on base to report to the base fire station and security forces control center. This additional cost would equate to $100,000. Further costs would be incurred to physically reconfigure both the fire station alarm room and security forces control center to make space for the second fire alarm head end. Costs associated to physically reconfigure the space amount to $10,000 (estimated). Lastly, training cost in the amount of $50,000 ( estimated) would be required to send base maintenance staff to manufacturer specific training on maintenance and programming. These training costs would be avoided as maintenance staff are currently trained to troubleshoot and maintain the existing Simplex Fire Alarm system.

Details

Military Facility, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents