Similar Projects
Highway Reconstruction and Bridge Replacements - Camden - Region 2
Demolition, New Construction, Infrastructure
Post-Bid
$18,892,871 CJ est. value
Camden, ME 04843

2023 Forest Grove Cemetery Mowing Services
Term Contract
Post-Bid
Lebanon, ME 04027

Entryway Steps Replacement Project
Alteration
Results
Houlton, ME 04730

2023 Roadway Paving
Infrastructure
Results
$115,508 CJ est. value
Bowdoinham, ME 04008

2023 Town Properties Mowing Services
Term Contract
Post-Bid
Lebanon, ME 04027

Large Culvert Replacement - Warren, Region 2
Infrastructure
Results
$775,126 CJ est. value
Warren, ME 04864

2023 Prospect Hill Cemetery Mowing Services
Term Contract
Post-Bid
Lebanon, ME 04027

2023 Roadway Improvements - Paris Maine
Infrastructure
Results
$747,659 CJ est. value
South Paris, ME 04281

Headstone Installation
Alteration
Post-Bid
Sanford, ME 04083

Crack Seal, Crack Repair and Mark Airport Pavements
Infrastructure
Results
$73,500 CJ est. value
Kingfield, ME 04947

Concrete Pads at the Swanville Transfer Station
Alteration
Post-Bid
$50,000 est. value
Monroe, ME 04951

Crack Seal / Repair and Marking Runway 14-32
Infrastructure
Results
$79,165 CJ est. value
Greenville, ME 04441

New Patios at Woodman Heights
Alteration
Post-Bid
$175,000 to $250,000 est. value
Waterville, ME

MSAD 51 Cafeteria Mechanical Upgrades
Renovation
Results
$372,497 CJ est. value
Cumberland Center, ME 04021

2022-2023 Crack Sealing
Infrastructure
Post-Bid
$40,000 CJ est. value
Buxton, ME 04093

Last Updated 06/22/2023 01:06 PM
Project Title

Newhall Road Bridge Replacement over Green Brook

Physical Address View project details and contacts
City, State (County) Wells, ME 04090   (York County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $682,860 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Job No- 804 The Project includes the following Work: Total removal of the existing concrete, steel and stone bridge (superstructure and substructure), construction of new bridge elements (precast prestressed deck panels, precast abutments, wingwalls and approach slabs and cast-in-place concrete deck topping and subfooting), bridge rail and approach rail, earthwork, drainage and approach roadway work. Bids are requested for the following Contract: Newhall Road Bridge Replacement over Green Brook Owner anticipates that the Project's total bid price will be approximately between $500,000.00 and $550,000.00. The Project has an expected duration of 60 days. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents