Similar Projects
Reported | 11/20/2021 12:00 AM |
Project Title | HVAC Upgrade - Parking Garage |
Physical Address | View project details and contacts |
City, State (County) | Leominster, MA 01453 (Worcester County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Fire Damper Provide a horizontal 1-HR fire damper at the existing exhaust duct. Install in accordance with manufacturer's printed instructions. Duct is approximately 30" by 30" (verify in field) New 8,000 CFM fan Replace existing fan with an 8,000 CFM variable speed mushroom-type fan. Connect to the existing Building Management System for control. Fan controls Fan shall run continuously and be interlocked with the motorized intake damper such that the fan will only run when the damper is proved to be open via an end switch on the damper. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |