Similar Projects
Wastewater Treatment Plant Construction
New Construction
Design
Sterling, IL

Aerobic Digester Conversion
Renovation
Bidding
La Salle, IL 61301

Womens Locker Room Facilities
Renovation
Bidding
Highland Park, Waukegan, IL 60087

Wastewater Treatment Facility Controls Upgrade
Post-Bid
Davis Junction, IL

Sewage Treatment Plant
Post-Bid
Hudson, IL 61748

West Side Water Reclamation Facility 2020 Phase III Expansion
Results
$16,000,000 to $20,000,000 est. value
Saint Charles, IL 60175

Wastewater Treatment Plant Improvements WWTP #1 Phase D
Results
East Peoria, IL 61611

Water Reclamation Plant Headworks Building Improvement
Renovation
Bidding
Less than $100,000 est. value
Wilmington, IL 60481

Bar Screen Replacement Project
Renovation
Post-Bid
Toluca, IL

WWTP and 10th Street Pump Station Improvements
Results
Less than $530,000 est. value
Cairo, IL 62914

Wastewater Treatment Facility UV Disinfection
Infrastructure
Post-Bid
Metropolis, IL

Water System Disinfection Conversion
Results
Northbrook, IL 60062

Electric Motor Rehabilitation
Renovation
Post-Bid
$380,000 est. value
Chicago, IL

Wastewater Treatment Facility Improvements
Results
Less than $7,120,000 est. value
Stockton, IL

Repair and Replacement of Certain Portions of the Sludge De-Watering Building
Renovation
Post-Bid
$200,000 est. value
Chillicothe, IL

Last Updated 04/01/2022 12:31 PM
Project Title

Red Hills State Park Replace Campground Sewage Treatment

Physical Address View project details and contacts
City, State (County) Sumner, IL 62466   (Lawrence County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,967,800
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the addition of water and electrical services to some of the campgrounds and campsites. It also includes replacement of existing privy toilets, improvements to the lagoon wastewater treatment plant, and abandonment of the sand filter wastewater treatment plant.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents