Similar Projects
Blue Heron Mine 18 Sanitary - New Onsite Wastewater Disposal System
Alteration
Design
Oneida, TN 37841

2020 Sewer System Rehabilitation CDBG Project
Infrastructure
Bidding
$500,000 est. value
Gainesboro, TN

Lupton Drive Chronic SSO Elimination
Renovation
Post-Bid
Chattanooga, TN 37400

Design/Build Services to Repair/Replace the Sanitary Sewer System at the Jacobs Civilian Conservation Center
Post-Bid
$500,000 to $1,000,000 est. value
Bristol, TN

East Ridge Sewer Basin 3C and 4B Rehabilitation
Results
Chattanooga, TN

Sewer Pipe
Term Contract
Results
Chattanooga, TN 37402

Sprinkler System
Renovation
Construction
Clarksville, TN 37040

Upper Station Camp Creek Sewer Extension
Post-Bid
Gallatin, TN

Sanitary Sewer Cured In Place Pipe Lining (CIPP) Blanket Contract
Results
Less than $2,000,000 est. value
Chattanooga, TN 37402

Sewer Relocation for the West Beaver Creek Drive
Post-Bid
$400,000 est. value
Knoxville, TN 37918

Storm and Sanitary Sewer Revisions at Lupton City Mill
Results
Less than $598,589 est. value
Chattanooga, TN 37402

Sewer Replacement
Post-Bid
Jamestown, TN

Sewer Video and Sonar Inspection Services
Results
Less than $765,000 est. value
Chattanooga, TN 37405

Ward Mill Road Low Pressure Sewer Contract A - Railroad Bore
Post-Bid
Baxter, TN 38544

Water and Sewer Line Replacement
Results
$180,000 to $220,000 est. value
Jellico, TN

Last Updated 01/26/2022 12:12 PM
Project Title

Belinda City Lateral Lining

Physical Address View project details and contacts
City, State (County) TN 37122   (Wilson County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Providing a cured-in-place pipe (CIPP) liner to stabilize structural defects and constructional inadequacies in sanitary sewer lateral pipelines. The liner shall be smooth, hard, strong, and chemically inert.Work to be performed under this contract described subsequently herein shall include materials, labor, equipment, and services necessary for: bypass pumping or diversion of sewage flows, pre-installation procedures, rehabilitation of existing sanitary sewer services by lining existing pipe, re-establishing connections to existing sewer main, initial and final CCTV inspection, and final testing of the CIPP system, the restoration of any utilities, parkways, trees, shrubbery, culverts, fences, and other items not covered under subsequent items disturbed by construction operations; back filling and removal of excess excavated materials; and testing

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents