Similar Projects
Student Athlete Performance Center
New Construction - 75,000 SF
Conception
$66,000,000 est. value
Murfreesboro, TN

Aquatics Facility
New Construction
Conception
Cookeville, TN

Dyersburg State Community College Baseball and Softball Training Facility
New Construction
Design
$1,700,000 est. value
Dyersburg, TN 38024

Recess Entertainment Venue
New Construction
Design
Nashville, TN 37210

Vanderbilt University Athletics Facilities
New Construction, Renovation - 570,000 SF
Bidding
$300,000,000 est. value
Nashville, TN 37240

Hunter Elementary School
Renovation, Addition
Bidding
$21,000,000 est. value
Elizabethton, TN 37643

Crunch Fitness
Build-Out - 27,627 SF
Sub-Bidding
Chattanooga, TN 37343

Rockbridge Assisted Living
New Construction - 54,894 SF
Post-Bid
$7,000,000 to $8,000,000 est. value
Chattanooga, TN

Carroll At Cane Ridge Apartment
New Construction - 503,843 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Nashville, TN 37013

East Lake Community Center Renovations
Renovation
Results
Less than $4,050,750 est. value
Chattanooga, TN 37400

Athletic Field House-East Ridge High School
Results
Less than $750,000 est. value
Chattanooga, TN 37412

Polk Event Hall
New Construction - 9,613 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Chattanooga, TN 37408

Signal Mountain Golf & Country Club
Renovation, Addition - 23,000 SF
Construction
Signal Mountain, TN 37377

Cardinal Point Multi-Family
New Construction, Infrastructure
Pending Verification
White House, TN 37188

Smokies Baseball Stadium
Renovation
Pending Verification
$74,500,000 est. value
Kodak, TN 37764

Last Updated 04/26/2022 02:36 PM
Project Title

Dickson Senior Center - Phase 2

Physical Address View project details and contacts
City, State (County) Dickson, TN 37055   (Dickson County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility, Clubhouse/Social Club
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install a four (4) ton split gas unit in Phase 1, Space #16-A storage room. This unit will serve spaces #15 corridor; #16 Billiard/Pool Room; and #16-A storage room. The unit shall be connected to the existing ductwork in these spaces. A return air grill shall be placed in the storage room #16-A door. The condenser for the unit shall be placed on the roof. Electrical power for the unit shall be utilized from the closest electrical panel. The gas piping required for this appliance shall come from the nearest available (existing piping) and adequate source. The submitted price for this Addendum shall reflect all materials and labor to complete.Install R-19 batt insulation over all new acoustical ceiling systems in all rooms and areas receiving acoustical lay-in ceiling systems in Phase II. General construction including mechanical, plumbing and electrical construction for renovations to an existing building of approximately 6,000 square feet.

Details

Athletic Facility, Renovation, Clubhouse/Social Club, 6,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents