Similar Projects
Lackland Road Culvert C-2-116 and Lackland Road Resurfacing
Infrastructure
Bidding
$200,000 est. value
Overland, MO 63114

Backyard Channel Improvements
Infrastructure
Bidding
$2,000,000 est. value
Belton, MO 64012

Harrison County Courthouse Landscape and Drainage Improvements
Post-Bid
Bethany, MO 64424

Clean and Shape Ditches
Alteration
Post-Bid
Martinsburg, MO

Deer Creek Flood Mitigation Phase 2
Results
Brentwood, MO

Paddock Creek Improved Channel Repair
Results
$597,000 est. value
Chesterfield, MO

Elementary Library Drainage
Infrastructure
Post-Bid
Iberia, MO

Romaine Creek Road - Slope Repair
Infrastructure
Results
$300,024 est. value
Hillsboro, MO

Caruthersville Floodwall Replacement
Term Contract
Post-Bid
$10,000,000 to $25,000,000 est. value
Caruthersville, MO

Sidewalk and Drainage Improvements
Infrastructure
Results
Saint Charles, MO

Culverts, Pipe and Bridge Materials
Infrastructure
Post-Bid
Lexington, MO

Choctaw Ridge Lagoon Closure
Infrastructure
Results
Holts Summit, MO

Precast Curb Inlets and Junction Boxes
Infrastructure
Post-Bid
Fulton, MO 65251

Joachim Street and Kennett Street Phase II Storm Drainage Improvements
Infrastructure
Results
De Soto, MO 63020

Culvert Pipe
Term Contract
Post-Bid
Saint Joseph, MO

Last Updated 06/16/2022 07:03 AM
Project Title

Greenwood Circle Drainage Improvements

Physical Address View project details and contacts
City, State (County) Osage Beach, MO 65065   (Camden County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. The work of this contract includes removal of existing features within the easement area. Construction of approximately 95 linear feet of new 18-inch RCP storm sewer and concrete flared end. Project includes grading, concrete slope anchors, rip-rap, and site restoration. Work shall include any other incidental items and work described in the Project Manual, or reasonably inferable therefrom. 2. The city reserves the right to add or delete portions of the work to meet budgetary requirements.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents