Similar Projects
Doran Apartments
New Construction
Conception
Hopkins, MN 55343

Wooddale Station Residential Mixed Use Development
New Construction
Conception
$84,000,000 est. value
Saint Louis Park, MN

Uptown Lofts
Addition - 11,606 SF
Design
Minneapolis, MN 55408

Mixed Used Commercial Building
New Construction - 134,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Minneapolis, MN 55418

Bryant Park Lofts
New Construction
Sub-Bidding
Minneapolis, MN 55408

Calhoun Isles Condominiums Window Replacement And Repairs
Renovation
Post-Bid
Minneapolis, MN 55416

Target #T1356 - Cafe Remodel
Renovation - 1,100 SF
Post-Bid
Minnetonka, MN 55345

Affordable Familiy Housing Units
New Construction
Results
Minneapolis, MN

Gethsemane Lutheran Church Food Shelf
Addition - 2,800 SF
Construction
Minneapolis, MN 55412

Bottineau Ridge Phase III
New Construction
Construction
$13,000,000 est. value
Maple Grove, MN 55369

Evanswood Housing Development
New Construction
Pending Verification
Maple Grove, MN 55311

Arlington Row East Apartments
New Construction
Pending Verification
$5,000,000 est. value
Saint Louis Park, MN 55426

Butcher & The Boar Restaurant
Build-Out - 12,000 SF
Conception
Minneapolis, MN 55401

Nicollet Ave Apartment Building
New Construction - 73,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Minneapolis, MN 55409

District 600 Apartments
Renovation
Post-Bid
Brooklyn Center, MN 55430

Last Updated 11/11/2021 01:25 PM
Project Title

Eden Avenue Mixed Use

Physical Address View project details and contacts
City, State (County) Edina, MN 55424   (Hennepin County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Food/Beverage Service, Parking Garage
Contracting Method Bids by Invitation.
Project Status Design Development, Construction Start Expected second quarter 2022, Construction Completion Expected second quarter 2024
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Apartments/Condominiums, New Construction, 196 Unit(s), Food/Beverage Service, 3,700 SF New Construction, Parking Garage, New Construction, 277 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Acoustical Ceilings, Resilient Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Refrigerated Display Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents