Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Westland Reservoir/Booster Station - Phase II - UT00502 - City of Peoria
Infrastructure
Conception
$5,450,000 CJ est. value
Peoria, IL 61603

RFQ - Various Phase I/II Engineering Projects, Various Routes
Term Contract
Design
Peoria, IL 61603

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

2022 Storm Sewer Lining
Infrastructure
Bidding
$622,000 CJ est. value
Mossville, IL 61552

Curb and Gutter Improvements Bradley Park
Infrastructure
Bidding
$351,000 CJ est. value
West Peoria, IL 61604

Construct Base Track
Post-Bid
$250,000 to $500,000 est. value
Peoria, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Asphalt Path Replacement at Rock Island Greenway
Results
Peoria, IL

Crack and Joint Sealing at Various Locations in Knox, Peoria, and Tazewell Counties
Results

RFQ - Phase II District Wide Pavement and Bridge Preservation Projects, Various Routes
Term Contract
Conception
Peoria, IL 61603

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Design
$4,000,000 CJ est. value
Dixon, IL 61021

Sealcoating
Post-Bid
Peoria Heights, IL

Longitudinal Joint Repair and Partial Depth Patching Along US 150
Results
Peoria, IL 61523

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Design
Schaumburg, IL 60194

Last Updated 08/08/2022 12:35 PM
Project Title

Mill and Resurface Parking Area and Install Parking Striping at the Peoria West Storage Yard

Physical Address View project details and contacts
City, State (County) Edwards, IL 61528   (Peoria County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $204,296 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Mill and resurface parking area and install parking striping at the Peoria West storage yard (6500 W. Highway 150, Edwards, IL., 2.5 Miles west of Peoria ou US 150). Region 3 District 4 Federal Project # N/A County(s) Peoria Key Route(s) Peoria West storage yard Marked Route(s) Section(s) D4 PARKING LOT RESUFR 2022-1 State Job #(s) C-94-043-22 PPS #(s) N/A VBP %:0.00 Completion Date : 15 Working Days Questions not accepted as of July 26, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, June 24, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 019 - Mill and Resurface Parking Area and Install Parking Striping at the Peoria West Storage Yard

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents