Similar Projects
Statewide Dam Improvements
New Construction
Bidding
$24,800,000 est. value

Statewide Dam Improvements
New Construction
Bidding
$24,800,000 est. value

Zoar Levee System Repairs, Zoar, OH
Post-Bid
Zoar, OH

Lower Olentangy Tunnel
Post-Bid
Columbus, OH 43215

Muskingum River Lock and Dam No. 7 Mcconnelsville Dam Replacement Design/Build
Results
Less than $7,300,000 est. value
McConnelsville, Minerva Park, OH 43229

Muskingum River Lock and Dam No. 7 Mcconnelsville Dam Replacement Design/Build
Results
Less than $7,300,000 est. value
McConnelsville, Minerva Park, OH 43229

WIO Culvert Valve Bulkhead Repairs
Term Contract
Bidding
Newport, OH 45768

Cleveland Bulk Terminal Ore Conveyance Tunnel Extension Project - Phase B
Post-Bid
Cleveland, OH

Southeast Dam Package - Veto Lake Dam Rehabilitation Project
Results
Less than $3,201,879 est. value
Belpre, OH 45714

Tainter Gate Parallel Shaft Speed Gear
Post-Bid
Delaware, OH 43015

Southeast Dam Package - Tycoon Lake Dam Rehabilitation Project
Results
Less than $3,201,879 est. value
Belpre, OH 45714

Youngstown Dam Removals Project
New Construction
Post-Bid
Youngstown, OH

Hoover Dam Improvements- Part 1
Results
Less than $15,381,250 est. value
Columbus, OH

Statewide Dam Improvements CMAR
Results
Less than $17,930,000 est. value
Celina, Circleville, Lake Milton, Van Buren, OH

Cleveland Bulk Terminal Ore Conveyance Tunnel Permanent Material Design Build Contract
Results
$2,881,518 est. value
Cleveland, OH 44113

Reported 07/02/2021 12:00 AM
Project Title

Muskingum River Parkway Lock & Dam Irrms

Physical Address View project details and contacts
City, State (County) State-Wide: OH
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $13,400,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Manager at Risk services are being requested for the management and construction of Interim Risk Reduction Measures (IRRMs) to improve the various lock and dam structures that make up the Muskingum River Parkway. A series of eleven low-head dams with accompanying locks were constructed by the State of Ohio between 1836 and 1841 as part of the Muskingum River Improvement System. The original purpose of the system was to assist commercial freight navigate the river. The U.S. Army Corps of Engineers (USACE) assumed responsibility for the eleven locks and dams in 1887 and performed a significant reconstruction of the system in the 1890s. The USACE maintained the structures until the 1950s when responsibility for the system was returned to the State of Ohio. Muskingum River Lock and Dam No. 1 at Marietta was removed by the USACE in the late 1960s in response to the construction of the USACE-owned Belleville Lock and Dam on the Ohio River.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents