Similar Projects
Plant Structural Improvements
New Construction
Results
$1,805,000 est. value
Modesto, CA 95351

Z--CA-Stone Lakes NWR-Pumps Station Replace
Renovation
Design
Elk Grove, CA 95757

Sewage Lift Station Pump Maintenance
New Construction
Results
$330,000 est. value
Carlsbad, Huntington Beach, Laguna Beach, San Clemente, CA

Sewage Lift Station Pump Maintenance
New Construction
Results
$330,000 est. value
Carlsbad, Huntington Beach, Laguna Beach, San Clemente, CA

Lift Station Repair at Colonel Allensworth Historical Park
Renovation
Post-Bid
Earlimart, CA 93219

Boathouse Lift Station Replacement Project
Renovation
Results
$300,000 est. value
Fremont, CA 94538

E Reservoir Replacement And Pump Station Project
New Construction
Post-Bid
$12,350,000 est. value
Vista, CA

LillyHill & L Street Water Booster Station
Renovation
Post-Bid
$1,500,000 est. value
Needles, CA 92363

Bridalveil Fall Comfort Station & Water Supply
New Construction
Bidding
Yosemite Lakes, CA

Inspect and Repair Rebuild Eight Turbine Pumps
Renovation
Post-Bid
Redding, CA

Last Updated 12/16/2021 09:14 AM
Project Title

McFadden Sewer Lift Station Replacement

Physical Address View project details and contacts
City, State (County) Huntington Beach, CA   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,170,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work of this Contract will consist of the abandonment and demolition of an existing sewer lift station, and the installation of a new 120 gpm submersible sewer lift station, wet well, valve vault, force main, and emergency generator. The project includes the construction of new gravity sewers, as well as curb, gutter, sidewalk, AC paving, and other appurtenant work not mentioned above, but required as part of the Contract Documents. • The contract shall allow the Contractor 180 working days to complete the contract.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.