Similar Projects
CHRL Pump Station 1A, 2 and 3
Infrastructure
Design
$750,000 est. value
WA

Well Rehabilitation and Water System Improvements Project - 2022
Infrastructure
Bidding
$350,000 to $400,000 est. value
Kahlotus, WA

Downtown Stormwater Treatment Project
New Construction, Infrastructure
Bidding
$10,400,000 est. value
Marysville, WA

Tapteal 1 Pump Station Upgrade
Infrastructure
Post-Bid
Richland, WA 99352

Condensate Pump 1 Alpha Refurbishment
Alteration
Post-Bid
Richland, WA

Water Station 5 Reservoirs and Pump Station
Infrastructure
Results
$28,250,000 est. value
Vancouver, WA 98687

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Aurora 1160 Series Pump Refurbishment
Alteration
Post-Bid
Keyport, WA 98345

Well No. 6
Alteration
Results
$2,189,000 est. value
College Place, WA 99324

Kayak Well Rehabilitation
Infrastructure
Post-Bid
$90,000 est. value
Stanwood, WA 98292

Illinois Well Facility
Infrastructure
Results
$3,025,682 to $3,276,814 est. value
Ellensburg, WA

Furnish and Install 60HP Input Pump Motor
Infrastructure
Post-Bid
Ridgefield, WA 98642

Tacoma Landfill Decommission Gets and Gas Probes
Infrastructure
Results
$593,000 est. value
Tacoma, WA 98421

Hanford Integrated Tank Disposition Contract
Alteration
Post-Bid
WA

New Water Supply Well Five
Infrastructure
Results
$235,000 est. value
Freeland, WA

Last Updated 01/10/2022 10:59 AM
Project Title

Walnut Street Rectifier and Deep Well Anodes Relocation and Replacement

Physical Address View project details and contacts
City, State (County) Ellensburg, WA 98926   (Kittitas County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $90,000 to $110,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of furnishing all labor, materials, equipment, and other miscellaneous items to install and commission a new deep well anode bed and rectifier at the new location of 1012 Seattle Avenue. The scope or the project also includes the decommissioning, removal, and abandonment of the existing rectifier and deep well anode bed system located off Walnut Street. The rectifier monitoring system “Watchdog”, shall be removed from the existing location and reinstalled with the new location.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents